Rheem PROPLUSG5047PRH62PDV

User Manual - Page 21

For PROPLUSG5047PRH62PDV.

PDF File Manual, 44 pages, Read Online | Download pdf file

PROPLUSG5047PRH62PDV photo
Loading ...
Loading ...
Loading ...
21
Read these instructions thoroughly and make
sure you understand all steps and procedures
before proceeding with the installation.
Determine the locations for the vent and
combustion air-inlet terminals then make
two (2) holes through the exterior wall to
accommodate the vent and combustion air-inlet
pipes.
Maintain a minimum horizational distance
of 1 ft. (30.5 cm) between the vent and
combustion air- inlet terminal centerlines.
Maintain a minimum distance from the
vent and combustion air-inlet terminals of
not less than 1 ft. (30.5 cm) above grade or
average snowfall whichever is greater.
Insert lengths of vent and combustion air-inlet
pipes through the wall as shown.
Allow sufficient length of pipe to extend
beyond the exterior wall of the building for
attachment of the vent riser assemblies as
shown.
Place the supplied 1/2 in. (1.3 cm) mesh metal
screens inside each terminal fitting.
NOTICE: For cold climates the screens may
be removed.
Connect the vent riser assemblies to the vent
and combustion air-inlet pipes which are
extending out of the building.
Ensure that the back of the 90° elbows
are flush with the outside wall surface
and that the vent and combustion air-inlet
terminations of the vent risers are parallel
with the outside wall.
IMPORTANT: Remember to include the
additional 90° elbows and vertical height of
vent and combustion air-inlet pipes of the vent
riser when calculating the maximum equivalent
vent and combustion air-inlet system lengths.
The maximum equivalent vent and combustion
air-inlet system lengths must be as specified by
Table 1 or 2.
The vent and combustion air-inlet
terminations are not included in the
equivalency calculations.
Horizontal Vent and Combustion Air-Inlet Alternate Vent Riser Terminal
Installation
(40, 50, & 65 Gallon Models ONLY)
Alternate Horizontal Vent and Combustion Air-Inlet Terminal Installation
Raise horizontal pipe upwards 1/8 in. per
foot (10 mm per m) min.
Rear of Termination
Flush with Outside
of Wall
Outside of
Building
Inside of
Building
Raise horizontal pipe
upwards 1/8 in. per foot
(10 mm per m) min.
Min 1 ft.
(30.5 cm)
Raise horizontal
pipe upwards 1/8 in.
per foot (10 mm per
m) min.
Optional - Condensate Management
Drain Port*
*See Condensate Management Section for
additional information about optional piping.
2 ft. x 2 ft. (60 cm x 60 cm)
Sheet Metal Shield on Brick or
Masonry Walls
Loading ...
Loading ...
Loading ...