DRAPER 02019 16 Speed Floor Standing Drill, 1100W

User Manual - Page 11

For 02019.

PDF File Manual, 24 pages, Read Online | Download pdf file

02019 photo
Loading ...
Loading ...
Loading ...
- 14 - - 11 -
7. UNPACKING AND CHECKING
8. ASSEMBLY
7.1 PACKAGING
Carefully remove the drill from the packaging and examine it for any sign of damage that may have
happened during shipping. Lay the contents out and check them against the parts shown below.
If any part is damaged or missing; please contact the Draper Helpline (the telephone number
appears on the Title page) and do not attempt to use the drill.
The packaging material should be retained at least during the guarantee period: in case the
machine needs to be returned for repair.
Warning! Some of the packaging materials used may be harmful to children. Do not leave any of
these materials in the reach of children.
If any of the packaging is to be thrown away, make sure they are disposed of correctly; according
to local regulations.
7.2 WHAT´S IN THE BOX?
As well as the drill; there are several parts not fitted or attached to it.
 Table height crank
handle.
 Rack.
 Work table.
 Guard assembly.
 Geared chuck.
 Base.
 Chuck key.
 Hex. keys
(3mm, 4mm, 5mm).
 Drift key.
 Work table height/
rotation locking
handle.
 Column.
 Head stock.
 Bolt and washers.
 Column base.
 Plunger handles.
 Table bracket.
 Collar.
 Arbor.

















%

FIG.9
8.6 CHUCK GUARD - FIG.9
Loosen the cross slot machine screw and nut.
Pass the chuck guard  over the chuck onto
collar $. When located fully and aligned on
the collar, tighten the machine screw and nuts
to secure the chuck guard in place.
NOTE: Do not over tighten as it may damage
the guard.
To adjust the lower acrylic guard section down
and fully cover the chuck and drill bits, loosen
wing nuts %.
When adjustment is complete, tighten the
locking nuts.
NOTE: The chuck guard shall be inspected
before each use to determine effectiveness and
correct functionality.
The chuck guard shall be adjusted and
positioned between the chuck and operator for
all processes.
Replace a damaged or missing chuck guard
before continuing to use the drilling machine.
8.7 BENCH/FLOOR MOUNTING
Securely bolt the drilling machine to a work
bench or other secure surface as appropriate
through the various points in the base (fixings
are not supplied). Suitable fixings should be
sourced applicable to the load and mounting
surface. Ensure there is enough clear space
around the drilling machine to accommodate
larger items which may be drilled.
Ensure the load created by the drilling
machine, operator and workpiece combined
will not compromise the integrity of the
intended mounting surface/floor space.
$
Loading ...
Loading ...
Loading ...