User Manual - Page 68

For RYB036GMFILCBD. Also, The document are for others Pioneer models: CB009GMFILCFHD, RB009GMFILCFHD, FB009GMFILCFHD, CB012GMFILCFHD, RB012GMFILCFHD, FB012GMFILCFHD, CB018GMFILCFHD, RB018GMFILCFHD, UB018GMFILCFHD, CB024GMFILCFHD, RB024GMFILCFHD, UB024GMFILCFHD, CB036GMFILCFHD, RB036GMFILCFHD, UB036GMFILCFHD, CB048GMFILCFHD, RB048GMFILCFHD, UB048GMFILCFHD, YN009GMFI22RPD, YN012GMFI22RPD, YN018GMFI22RPD, YN024GMFI22RPD, YN036GMFI17RUD, YN038GMFI17RUD

Loading ...
Loading ...
Loading ...
65
pressure of the low side), disconnect the charge
hose from the 3-way valve’s service port
immediately and turn off the air conditioner
before disconnecting the hose.
7). Mount the valve stem caps and the service
port
Use torque wrench to tighten the service port
cap to a torque of 18N.m.
Be sure to check for gas leakage.
12.4.5 Re-installation while the indoor unit
need to be repaired
1. Collecting the refrigerant into the outdoor
unit
Procedure
1). Confirm that both the 2-way and 3-way
valves are set to the opened position
Remove the valve stem caps and confirm that
the valve stems are in the opened position.
Be sure to use a hexagonal wrench to operate
the valve stems.
2). Connect the charge hose with the push pin
of handle lo to the 3-way valves gas service
port.
3). Air purging of the charge hose.
Open the handle Lo valve of the manifold valve
slightly to purge air from the charge hose for 5
seconds and then close it quickly.
4). Set the 2-way valve to the close position.
5). Operate the air conditioner at the cooling
cycle and stop it when the gauge indicates
0.1Mpa (14.5Psi).
6). Set the 3-way valve to the closed position
immediately
Do this quickly so that the gauge ends up
indicating 0.3Mpa (43.5Psi) to 0.5 Mpa
(72.5Psi).
Disconnect the charge set, and tighten the
2-way and 3-way valve’s stem nuts.
Use a torque wrench to tighten the 3-way valves
service port cap to a torque of 18N.m.
Be sure to check for gas leakage.
2. Air purging by the refrigerant
Procedure:
1). Confirm that both the 2-way and 3-way
valves are set to the closed position.
2). Connect the charge set and a charging
cylinder to the service port of the 3-way valve
Leave the valve on the charging cylinder closed.
3). Air purging.
Open the valves on the charging cylinder and
the charge set. Purge the air by loosening the
flare nut on the 2-way valve approximately 45’
for 3 seconds then closing it for 1 minute; repeat
3 times.
After purging the air, use a torque wrench to
tighten the flare nut on the 2-way valve.
4). Check the gas leakage
Check the flare connections for gas leakage.
5). Discharge the refrigerant.
Close the valve on the charging cylinder and
discharge the refrigerant by loosening the flare
nut on the 2-way valve approximately 45’ until
the gauge indicates 0.3Mpa (43.5Psi) to 0.5
Mpa (72.5Psi).
6). Disconnect the charge set and the charging
cylinder, and set the 2-way and 3-way valves to
the open position
Be sure to use a hexagonal wrench to operate
the valve stems.
Loading ...
Loading ...
Loading ...