Loading ...
Loading ...
Loading ...
Page:
6
User Manual:
Your Esatto Cooktop
SPECIFICATIONS
MODEL PRODUCT DIMENSIONS
W×D×H
CUTOUT DIMENSIONS
D
CONNECTION POINT LOCATIONS
DIAGRAM ABOVE
ECG6 600mm, 510mm, 40mm 560mm x 480mm
Gas: 42mm (from left), 60mm (from rear)
Electrical: 220mm (from right), 40mm (from
rear)
ECG61 580mm, 500mm, 40mm 560mm x 480mm
Gas: 33mm (from left), 65mm (from rear)
Electrical: 96mm (from right), 52mm (from rear)
ECGW61 580mm, 500mm, 40mm 560mm x 480mm
Gas: 33mm (from left), 65mm (from rear)
Electrical: 96mm (from right), 52mm (from rear)
ECG60S 580mm, 500mm, 40mm 560mm x 480mm
Gas: 33mm (from left), 65mm (from rear)
Electrical: 96mm (from right), 52mm (from rear)
ECGW60S 580mm, 500mm, 40mm 560mm x 480mm
Gas: 33mm (from left), 65mm (from rear)
Electrical: 96mm (from right), 52mm (from rear)
MODEL BURNERS NG OTHER
ECG6
1 × 10.8 MJ/h rapid burner
2 × 6.5 MJ/h semi-rapid burners
1 × 3.6 MJ/h auxiliary burner
Front control operation
Automatic ignition
Enamel trivets
ECG61
1 × 10.8 MJ/h rapid burner
2 × 6.5 MJ/h semi-rapid burners
1 × 3.6 MJ/h auxiliary burner
Side control operation
Automatic ignition
Heavy duty cast iron pan stands
Flame failure safety device on each burner
ECGW61
1 × 14.4 MJ/h triple crown (wok) burner
2 × 6.5 MJ/h semi-rapid burners
1 × 3.6 MJ/h auxiliary burner
Side control operation
Automatic ignition
Heavy duty cast iron pan stands
Flame failure safety device on each burner
ECG60S
1 × 10.8 MJ/h rapid burner
2 × 6.5 MJ/h semi-rapid burners
1 × 3.6 MJ/h auxiliary burner
Side control operation
Automatic ignition
Heavy duty cast iron pan stands
Flame failure safety device on each burner
ECGW60S
1 × 14.4 MJ/h triple crown (wok) burner
2 × 6.5 MJ/h semi-rapid burners
1 × 3.6 MJ/h auxiliary burner
Front control operation
Automatic ignition
Heavy duty cast iron pan stands
Flame failure safety device on each burner
COOKTOP COMPONENTS
Your Esatto cooktop is supplied with:
LPG conversion jets (optional use)
Regulator
Sealing strip
Connection points diagram above:
1. Front of cooktop
2. Gas connection point
3. Electrical connection point.
Loading ...
Loading ...
Loading ...