Loading ...
Loading ...
Loading ...
User Manual Page 17
Installation
Instructions
9 Install Chassis into Cabinet and Install Front to Unit
1. Lift air conditioner and carefully slide into cabinet leaving 6” protruding.
2. DO NOT press or apply pressure to controls or  nned coils.
3. Be sure chassis is firmly seated towards rear of cabinet.
4. Installation of front is the reverse of removal outlined in Section 1.
10 Install R1 Insulation Hardware (only applicable to Energy
Star models)
In order to minimize air leaks and ensure optimal insulation, it is
necessary to install the included R1 insulation hardware to the
side curtain. Follow the instructions below.
Step 1.
After the unit is installed in the window, measure the inner width
of the side curtain as shown (Fig. 20).
Measure the inner width
of the side curtain
Fig. 20
Fig. 21
or
Step 2.
Mark a line on the provided R1 insulation panel that is 1/8” (3
mm) less than the measured width in step 1, then cut the R1
insulation panel along the line (Fig. 21).
Fig. 22
Step 3.
Slide the R1 insulation panel into the side curtain. The side
with the pattern should facing indoors. (Fig. 22).
Step 4.
Repeat on the other side.
Loading ...
Loading ...
Loading ...