Loading ...
Loading ...
Loading ...
C0322 through C1030
Air and Water Cooled User Manual
November 2012
Page 14
Adjustments
Bridge Thickness - For the Service Tech Only
1. Push and hold Off till the machine stops.
2. Remove evaporator cover.
3. Remove curtain.
4. Use a hex wrench and rotate the bridge thickness
adjustment screw in 1/8 turn increments CW
to increase bridge thickness. Rotate CCW to
decrease bridge thickness.
Caution: Do not make the bridge too thin or the
machine will not harvest properly. Bridge thickness
adjustments are not covered by warranty.
5. Return curtain and evaporator cover to their
normal positions.
6. Push and release the On button. Check next
harvest of ice. Repeat steps 1-6 if needed.
Water Purge Setting
The water purge is factory set to the automatic
position, suitable for most water conditions. The
setting can be changed to one of 5 manual settings or
left on automatic.
Purge setting 1 - Minimum 2 - Moderate 3 - Standard 4 - Heavy 5 - Maximum A - Automatic
Water Type RO water or
equivalent
Low TDS
non - RO
water
Use for typical
water
High TDS
water
Very High TDS
water
Any with
conductivity not
less than 10
microSiemens/
cm
To set:
1. Switch the machine OFF by holding the Off button
in until a number or the letter A shows on the
display.
2. Press and release the On button repeatedly until
the number on the display corresponds to the
desired setting.
3. Press and release the Off switch again to return to
the normal control state.
Bridge Thickness Adjustment Mechanism
Note: Water cooled models, the refrigeration system
discharge pressure is factory set at 245 PSIG,
which should yield a freeze cycle discharge water
temperature of about 105-110 degrees F. Adjust if
necessary.
Note: Indentations may be deeper on C0322 and C0330
Ice Bridge Thickness Measurement
Adjustment
Screw
1/8-3/16”
bridge
Too Big
Just Right
Too Small
Loading ...
Loading ...
Loading ...