Loading ...
Loading ...
Loading ...
C0322 through C1030
Air and Water Cooled User Manual
November 2012
Page 12
Final Check List
After connections,
1. Wash out the bin. If desired, the interior of the bin
could be sanitized.
2. Locate the ice scoop (if supplied) and have it
available for use when needed.
Final Check List:
1. Is the unit located indoors in a controlled
environment?
2. Is the unit located where it can receive adequate
cooling air?
3. Has the correct electrical power been supplied to
the machine?
4. Have all the water supply connections been
made?
5. Have all the drain connections been made?
6. Has the unit been leveled?
7. Have all unpacking materials and tape been
removed?
8. Is the correct switch bezel installed in the trim
strip?
9. Is the water pressure adequate?
10. Have the drain connections been checked for
leaks?
11. Has the bin interior been wiped clean or sanitized?
12. Have any water lter cartridges been replaced?
13. Have all required kits and adapters been properly
installed?
Loading ...
Loading ...
Loading ...