Loading ...
Loading ...
Loading ...
C0322 through C1030
Air and Water Cooled User Manual
November 2012
Page 13
Initial Start Up
1. Remove front panel and evaporator cover. Check
machine for any packing or wires rubbing moving
parts. Note location of control board in upper left
corner of the machine’s front.
2. Switch on the electrical power to the machine.
Observe that some of the control’s indicator lights
glow and its display shows O.
3. Open the water supply valve.
4. Push and release the ON button. The code display
will begin to blink F.
The purge valve opens, the water pump starts and
the inlet water valve opens to add water to the
reservoir. In a few seconds the purge valve closes
and the water pump stops. Water will ow into the
machine until the reservoir is full. The hot gas valve
and harvest assist device will activate, then the
compressor and water pump will start. If it’s an air
cooled model the fan motor(s) will begin to turn a few
moments after the compressor starts. The display
will show a continuous F. Five seconds later the hot
gas valve will close and the harvest assist device
will return to its standby position. Warm air will be
discharged from air cooled models.
5. Observe the Ready for Harvest indicator light. It
may blink early in the cycle, that is normal. The
control will ignore that signal for the rst 6 minutes
of freeze.
6. During the Freeze cycle move the curtain and
observe that the SW1 or SW2 light on the control
board blinks On when the curtain moves away
from the evaporator and Off when returned to its
normal position.
Note: Moving the curtain during the Freeze cycle has
no affect on control function, but will cause water to
ow into the cube chute.
7. When enough ice has frozen, the Ready for
Harvest indicator light will be on steady. After it’s
been on steady for a few seconds Harvest will
begin.
The display shows an H. The hot gas valve opens, the
air cooled fan motor(s) shut off and the harvest assist
mechanism is activated. The purge valve opens to
drain some water, when it does the inlet water valve
opens to rell the reservoir. After a few seconds the
purge valve closes but the inlet water valve continues
to ll the reservoir. Harvest continues until the ice
is released as a unit and forces the curtain to open.
When the curtain opens it signals the controller which
returns the unit to a freeze cycle.
8. Check the ice harvested for proper bridge
thickness. The ice bridge is factory set at 1/8 inch.
If needed, adjust bridge thickness. Do NOT make
it too thin.
9. Return the front panel and evaporator cover to
their normal positions and secure to the machine.
10. Instruct the user in the operation of the machine
and its maintenance requirements.
11. Fill out and mail the warranty registration form or
register it on line at Scotsman-ice.com.
Typical Ice Making Cycle Times (minutes).
Listed times are for clean machines in proper
installations. Cycle length at startup will be longer until
the system stabilizes.
Model 70
o
F air / 50
o
F.
water
90
o
F. air / 70
o
F.
water
C0322A 10-12 14-16
C0322W 9-11 10-12
C0522A 11-13 16-18
C0522W 13-15 13-15
C0330A 9-11 12-14
C0330W 8-10 9-11
C0530A 12-14 16-18
C0530W 10-12 11-13
C0630A 9-11 1 1-13
C0630W 7-9 10-12
C0722A 13-15 19-22
C0830A 10-12 13-15
C0830W 11-13 12-14
C1030A 9-11 11-13
C1030W 9-11 10-12
Loading ...
Loading ...
Loading ...