Loading ...
Loading ...
Loading ...
Part Number 000014141 Rev06 9/19 47
Section 4 Maintenance
D. Remove the water level probe
• Pull the water level probe straight down
to disengage.
• Lower the water level probe until the
wiring connector is visible.
• Disconnect the wire lead from the water
level probe.
• Remove the water level probe from the
ice machine.
E. Remove the water distribution tube(s)
NOTE: Thumbscrews for the distribution
tube are retained to prevent loss. Loosen
thumbscrews, but do not pull thumbscrews
out of distribution tube.
• Loosen the two outer screws (do not
remove screws completely because
they are retained to prevent loss) and
pull forward on the distribution tube to
release from slip joint.
• Disassemble distribution tube
by loosening the two (2) middle
thumbscrews and dividing the
distribution tube into two pieces.
A
E
D
C
B
Loading ...
Loading ...
Loading ...