2200W ILve Ice Cream, Yogurt Machines

User Manual - Page 5

For 2200W.

PDF File Manual, 13 pages, Download pdf file

Loading ...
Loading ...
Loading ...
4. Installation and debugging
1) Installation
a. Cut off and dismantle the packing belt of the fastened carton. Get rid of the carton and take
down the packaging bag to check whether the appreance of the machine is damaged and whether
the accessories are complete with reference to the list.
b. The machine should be placed evenly and stably, and after then please lock the brake of the
front wheel tight.
c. Install the handle to the liquid outlet valve against the product structure diagram, Then install
the assembled liquid outlet valve on the machine, and tighten it with the fixing nuts.
d. Working conditions:
Ambient temperature: 5-40; material feeding temperature: 2-35 (Note: The material
feeding temperature will directly influence the refrigerating capacity and outputs.)
Supply voltage: 100-120v (The deviation of rated supply voltage cannot be too high or too
low. If it is too high or too low, the machine will alarm (buzzing) and the machine cannot start.).
Supply frequency: 60±1 Hz
e. Placing conditions:
The machine should be placed at a cool and ventilated location and avoid heat source and
direct sunshine. The distance between the air exhausting side of the machine and wall or other
similar obstacles should be over 1m, and the rest sides of the machine should be over 0.3m away
from the wall or other similar obstacles, so that the cool air can flow in the machine and exhaust
the hot gas to ensure condensation cycle of the machine.
The machine should not be located at a dusty place. Please keep the place clean and tidy,
and regularly clear away the dust on the condenser.
f. Requirements for power supply wiring:
Please ensure the the power supply circuit of the mahcine is equipped with the short-circuit
protection and earth leakage protection devices.
Please ensure the power line should not be less than 4mm
2
and be the copper core wire
(excluding the exceptional high-power machine, whose power line should not be less than 6mm
2
and be the copper core wire.), and the power line shouldnt be too long. When the power line is
too small or too long, its load will become too large and causes voltage drop, thus affecting the
service life of the machines components.
2) Debugging
a. Switch on the power plug and push the power switch to the ON position. Then you will hear a
Beep sound and the display screen at the same time is on. The machine now is entering the
standby state.
b. As you press the Wash key, the machine enters the washing state, and the stirring system
begins to run at the same time. Press the Stop key and the machine will stop its running.
c. As you press the Auto key, the machine enters the moulding stage, and the stirring system
begins to run at the same time. After 10 seconds delay, the refrigerating system also begins to start.
Press the Stop key and the machine will stop its operation.
3) Cleaning and disinfection
When the machine is used for its first time, the cleaning and disinfection work should be carefully
made. The steps are as follows:
3
Loading ...
Loading ...
Loading ...