3 Operation
3.1 Check before Power-on
Context
After installing the V-POWER S05, users need to perform a pre-power check to ensure that the device
installation and cable connection are correct before performing the power-on operation.
Procedure
1 Check whether the V-Power S05 sequence is consistent with the layout diagram.
2 Check the cable connection on site.
Check whether the cables are connected correctly, whether the connectors are firm, and
whether the self-locking connector is tightly connected.
Check whether the communication cable and the power cable are separated.
3 Check whether the V-Power S05 are grounded.
4 Check the switch status.
The DC output switch of the V-Power S05 should be off.
The DC switch of the inverter should be off.
The circuit breaker from the inverter to the grid should be off.