V-Tac VE51100W 5.12kWh Wall Mounting Battery Weatherproof

Manual - Page 17

For VE51100W.

PDF File Manual, 30 pages, Read Online | Download pdf file

VE51100W photo
Loading ...
Loading ...
Loading ...
13
Figure 10. V-Power S05 grounding
2.4 Connecting Power Cable
Context
1. Insulate installation tools to prevent electric shocks.
2. According to the power value of the inverter used, the number of battery configurations should match the following
minimum number of parallel connections:
a. When the inverter power 5kW: need to configure at least one VE51100W battery.
b. When 5kW < inverter power 10kW: need to configure at least two VE51100W batteries (connect in parallel).
3. According to the power value of the inverter used, two ways are shown to connect the power cable when batteries
are used in parallel:
a. When the inverter power 10kW, multiple batteries are used in parallel, connect the power cable base on the
Figure 13~15 wiring method.
b. When 5kW < inverter power 10kW, multiple batteries are used in parallel, a "Junction Box" is required, first
connect the power cable of each battery to the junction box, then connect the power cable from the junction box to the
inverter.
Loading ...
Loading ...
Loading ...