V-Tac VE51100W 5.12kWh Wall Mounting Battery Weatherproof

Manual - Page 12

For VE51100W.

PDF File Manual, 30 pages, Read Online | Download pdf file

VE51100W photo
Loading ...
Loading ...
Loading ...
8
2 Installation
2.1 Precautions for Installation
Light intensity is required near the installation location.
Comply with the safety operation technical regulations when lifting and handling heavy objects.
Equipment and tools must be complete, intact, and reliable. It is strictly prohibited to use tools with
cracks, burrs, loose handles, etc., that do not meet the safety standards.
Installation operations must be guided by qualified engineers.
During installation, two people must work together, one operating and the other inspecting.
The original cable connection and operation process shall not change without the authorization of
the company's consent.
2.2 Preparing for Installation
2.2.1 Tools
Insulated installation tools must be used to prevent electric shocks. If tools without insulation protection
are used, the exposed metal parts must be wrapped and insulated with insulating tape.
The following table shows tools that need to be prepared before installation.
Table 7. Tools
Electric forklift
Manual forklift
Electric screwdriver
Impact drill
Phillips screwdriver
Socket wrench
Insulated torque wrench
Tape measure
Loading ...
Loading ...
Loading ...