58
English
Installation Procedure
Installation Procedure
Outer diameter (mm)
Tightening torque
Body cap (N•m) Charging port cap (N•m)
ø 6.35 20 to 25
10 to 12
ø 9.52 20 to 25
ø 12.70 25 to 30
ø 15.88 30 to 35
Over ø 19.05 35 to 40
(1 N•m = 10 kgf•cm)
NOTE
• Be extra cautious for the gas leakage from the 3-way
valve’s stem nuts (gas side), and from the service port
cap.
Pressure table for each temperature
If extra refrigerant charging is required due to gas leakage or
product relocation, see the following table.
Cooling operation
Unit: [kPa, G]
Indoor temperature (°C)
(Dry bulb /
Wet bulb)
O
u
tdoor temperature (°C)
32/23 27/19 21/15
46 1040 850 730
35 920 750 640
21 830 690 590
7 690 540 490
-15 550 400 370
NOTE
• Pressure for each temperature was measured at the
gas side service valve.
Step 16 Fixing and insulating the
connection part for refrigerant pipes
CAUTION
• Before wrapping the connection part for refrigerant
pipes, be sure to check whether there is gas leakage on
the connection part.
1 Wrap the foam insulation around the connection
part as shown in the figure. This wrapping minimises
condensation.
High
pressure
pipe
Low
pressure
pipe
Pipe insulation
Insulator for pipe
connection part
30 mm or more
NOTE
• Use polyethylene foam over 5 mm thick to insulate the
connection.
DB68-11731A-02_IBIM_PAC Mirage Cooling Only_TC_EN_.indd 58DB68-11731A-02_IBIM_PAC Mirage Cooling Only_TC_EN_.indd 58 2023-07-19 오전 9:52:222023-07-19 오전 9:52:22