Loading ...
Loading ...
Loading ...
CEILING RECESS KIT (SOLD SEPARATELY)
1. Prepare ceiling cut out & ceiling box.
Minimum ceiling box dimensions must be as shown in
table. Heater must be installed with heater surface at
least 2400mm above the floor level.
2. From below, bring ceiling frame up and into ceiling cut out.
3. Fasten ceiling frame to ceiling box through mounting
holes with fasteners (not supplied).
4. Prepare heater for installation.
Attach mounting brackets to both ends of heater with
supplied fasteners.
500
368
A
2 LAYERS OF 16MM FIREPROOF
INSULATION MUST BE INSTALLED ON ALL
SURFACES OF CEILING BOX
MODEL
DIMENSION "A"
2000W & 4000W
1170
3000W & 6000W
1463
www.bromic.com/heating-au
10
HEATER INSTALLATION CONTINUED...
! WARNING
MINIMUM DISTANCE BETWEEN
HEATERS MEASURED FROM EDGE OF
HEATER MUST BE AT LEAST 500mm
Loading ...
Loading ...
Loading ...