Loading ...
Loading ...
Loading ...
15
Preparation of Floor Openings and Unit Fastening
INSTALLATION INSTRUCTIONS
Clearances and Procedure for Securing the System:
Installation of the machine involves creating openings in the oor. ese openings
must not be covered or obstructed by parts of the chassis frame or similar xtures.
It is also important to block the openings from splashes coming from the wheels,
using a splash guard or something similar if necessary.
Take special care to ensure a gap of at least 1 inch is left between the machine and
its adjacent walls. Use the provided kit to secure the machine to the interior oor.
e machine must be installed completely level. ere is a maximum angle of
10° to prevent condensation leakage.
Prior to cutting the holes, verify that there are no cables, gas pipes, or parts of
the chassis frame or similar xtures underneath or hidden below.
Seal the machined surfaces of the oor openings with water-repellant solutions.
2” - 1/2
28” - 7/8
15” - 5/8
5/8”
7” - 1/2 2” 5” - 3/8
10” - 5/8
8” - 1/8
8” - 1/2
1” - 3/4
1” - 1/8
A small hole can be cut to optimize
the performance of the system.
(See page 17)
Bottom View
e provided kit is used
to secure the machine to
the interior oor.
*All measurements
in inches
REAR
SIDE
Loading ...
Loading ...
Loading ...