Cobra CP4 450mm Single Pan Gas Pasta Cooker

Installation And Operation Manual - Page 17

For CP4. Also, The document are for others Cobra models: CN4

PDF File Manual, 21 pages, Read Online | Download pdf file

CP4 photo
Loading ...
Loading ...
Loading ...
15
1. Set low fire screw as shown in Gas Specifications
Table at rear of this section.
2. Connect a manometer to upper test point
(Burner Operating Pressure) on gas control valve.
Turn ‘On’ gas and light the main burner
3. Ensure burner operating pressure is as shown in
Gas Specifications Table at rear of this section.
4. Check the flame size on the ‘Low’ position.
NOTE:
‘Low Fire Screw’ should be sealed with coloured
paint on completion of low fire adjustment.
5. Refit the following:-
Gas control knob.
Water control knob.
Control Panel.
On completion of gas conversion, replace gas type
labels located at:-
- Rear of unit, above gas connection.
- Beside rating plate.
Burner Operating
Pressure
Gas Control
Valve
Low Fire Adjust
Screw
Before leaving installation;
1. Check all gas connections for leakage using
soapy water or other gas detecting equipment.
2. Carry out a ‘Commissioning’ check of the
appliance as shown in Installation Section of this
manual.
3. Ensure any adjustments done to components
that have adjustments / settings paint sealed,
these are to be re-sealed.
NOTE:
If for some reason it is not possible to get appliance
to operate correctly, shut Off’ gas supply and
contact supplier of this appliance.
DO NOT USE A NAKED FLAME TO CHECK FOR GAS LEAKAGES.
Loading ...
Loading ...
Loading ...