Loading ...
Loading ...
Assembling
Assembled models without
attached tools will look like
this drawing.
deep cleaner
Assembled models with
attached tools will look
like this drawing.
Attach upper handle
Remove clean solution tank
(upper tank)(Fig. 1).
I
Remove nozzle stored on upper
handle by gently pushing nozzle
downward while pivoting it away
From the handle at (B).
II
CORD
HOOK
With cord hook to back of deep cleaner, push
upper handle down onto lower handle. (Fig.3).
Push bolts into holes on front of handle (Fig. 4).
If bolts will not go through hole easily handle is not pushed
completely down.
Place nuts in recessed areas on back of handle, Hold each
nut in place while tightening each bolt securely with a Phillips
screw driver (Fig. 5).
Only two nuts are needed on this model. The extra nut is not
required but has been provided for your convenience.
il
QU EEZE
IGGER
When handle sections are completely together, squeeze
trigger on upper handle to snap trigger rod in place (Fig. 6).
II
TANK
Replace clean solution tank (upper tank) by positioning bottom
first. Press on tank handle to snap top of tank into place (Fig. 7).
Continued -I_
Assembly 3
Loading ...
Loading ...
Loading ...