Accu-Steam™ Installation and Owners Manial
MP5004-1202 PAGE 21
10. Install the grease trough hanger brackets onto the bottom side of the griddle using (2)
#10-24 X ½ inch Phillips round head machine screws and (2) 5/16-18 X ¾ inch carriage
head bolts with (2) 5/16 inch lock washers and (2) 5/16-18 nuts (see drawing AT2A-3044,
sheet 6). Leave the carriage bolts loose for adjustment of the grease trough.
11. Install the grease trough using (4) #10-24 X ½ inch Phillips round head machine screws
through the front panel opening and through the hanger bracket assembly, installed in step
10.
12. Adjust the hanger bracket height so that the grease trough is setting level front-to-back
and tighten the 5/16-18 nuts.
13. Install the appropriate size grease spout extension onto the griddle grease spout, that
ensures the bottom of the grease spout extension is ush to the inside surface of the
grease trough assembly (see drawing AT2A-3044, sheet 6).
14. Use the caulking gun to lay a 1/8” minimum diameter bead of the aluminized silicone
sealant around the griddle module mounting ange onto the counter top. Use a gloved
nger to wipe the sealant into a llet shape.
15. Install the interconnect cable between the control panel module and the control box,
mounted on the bottom side of the griddle (see drawing AT2A-3044, sheet 6).
16. Set the on/off switch to the off position and set the temperature control knob to the lowest
setting.
17. Install the power cord into an appropriate sized electrical connection box with an
appropriate sized cord grip or cable strain relief. Complete the nal connections,
testing the house supply wire rst to ensure it is not live.
18. Turn on power to the griddle at the fuse panel.
19.Turn the griddle on and set the temperature control knob to a desired setting. Wait
a minimum of 20 minutes. Then use a suitable temperature-measuring device to check
the griddle surface temperature. The surface temperature should be within 5 – 7 °F of the
temperature control knob setting. If it is not, go to the calibration section and follow the
calibration procedures.
20.This completes the drop-in griddle installation.