Loading ...
Loading ...
Loading ...
5
2. DIMENSIONS
2.1 EVO5 700 HRV HEPA AND HRV 7.1 HEPA UNITS
11¼"
17
7
/16"
37
7
/8"
33"
12 /8"
VK0121A
39 /8"
2.3 JOIST OPENING REQUIRED FOR TANDEM
®
TRANSITION
VD0118A
8¾”
222 mm
9¾”
248 mm
The joist opening needed to install the Tandem tansition* (included in ISKV1000
and ISKB1000 installation kits) must be 9¾” (248 mm) minimum. Also, the
maximum height of the Tandem transition is 8¾” (222 mm). See Tandem transition
end view at right.
* Patended
2.2 EVO5 500 HRV AND HRV 5.1 UNITS
11¼”
17
7
/16”
37
7
/16”
35
7
/8”
31”
12 ³/8”
VK0120A
Loading ...
Loading ...
Loading ...