Loading ...
Loading ...
Loading ...
6 EN
Refrigerator / User Manual
3 Installation
To reduce the risk of fire, electrical shock, or injury to persons,
installation work and electrical wiring must be done by a qualifi
ed technician in accordance with all applicable codes and
standards, including fire-rated construction.
It is the customer’s responsibility to:
• Contact a qualified electrical installer.
Assure that the electrical installation is adequate and
in conformance with the National Electrical Code,
ANSI/NFPA 70-latest edition or Canadian Electrical
Code C22.1-1998 and C22.2 No. 0-M91 (or latest
edition), and all local codes and ordinances.
Product must not be plugged in during installation.
Otherwise, there is the risk of death or serious injury!
WARNING: Installation and electrical
connections of the product must be carried out by
the Authorised Service Agent. Manufacturer shall
not be held liable for damages that may arise from
procedures carried out by unauthorized persons.
WARNING: Prior to installation, visually check
if the product has any defects on it. If so, do not have
it installed. Damaged products cause risks for your
safety.
Make sure that the power cable is not pinched or
crushed while pushing the product into its place after
installation or cleaning procedures.
Appropriate installation location
WARNING: If the door of the room where the
product will be placed is too small for the product
to pass, then the product's doors must be removed
and the product must be turned sideways to pass it
through.
Install the product at least 12” (30 cm) away from heat
sources such as gas cooktops, ovens, and stoves and at least
2 (5 cm) away from electrical ovens. Product must not be
subjected to direct sun light and kept in humid places after
installation.
Do not place the product on rugs or carpets.
Place the product on an even floor surface to prevent
wobbling.
Do not install the product in places where the temperature
falls below 10ºC /50°F.
If two refrigerators are to be installed side by side,
there should be at least 1-1/2
(4 cm) distance
between them.
Bult-In Installaton
If the product will be placed in a cutout, make sure suffcent room
s provded around the applance to ensure free ar crculaton.
To
ensure proper ventlaton:
-Allow for a 5/8” (1.6 cm) space on each sde and 2” (5.1 cm) at the top.
-Allow 1-3/8” (3.5 cm) of space behnd the refrgerator.
Proper Circulation
unscrew before the nstallaton
Install the vertcal metal bracket and screw.
The longer screw must
be used on the top.
For effcent functonng n the cutout, the metal bracket and ar
buffer bumpers must be added to product.
Loading ...
Loading ...
Loading ...