Loading ...
Loading ...
Loading ...
Installationoftherange.
Read theseinstructionscompletely and carefully.
Three-Wire CordConnection
Black
onrangeback
ff localcodesrequireanungroundedneutral:
Follow steps1through 5.
Topnut
Ground
strap
Blacklead
Redlead
Strain relief
clamp
[] Remove the top nuts on the.junction
block studs.
[] Tighten tile ba(k nuts.
[_] Install the three xdre lord and the strain
relief in the hole in the strain relief bra(ket.
[_] Connect the red and bla(k leads to the
'LLJ
outer temfinals and the white lead to the
(enter terminal.
Black
block
onrangeback
Red
Topnut Groundwire
Ground
strap White lead
Blacklead
Redlead
Strain relief
clamp
Then loosen tile S(TeWfrom the ground strap and
fasten a #10 copper wire to the range. Secure the
other end of the wire to a gr_unded coM wa/er
pipe or use another appr_)ved grounding
method.
[] Push the cordupward (to relieve suain),
while tightening the strain relief(lamp.
16
Four-Wire CordConnection
Black
Blacklead
Ground
screw
White lead
_ roundstrap
removed
[] Remove the top mlts on the junction
block smds.
[] Tighten the balk nuts.
] Removethegrounds(rew; thenremove
the ground strap.
[] Install the four wire cord and strain reliefin
file hole in the strain reliefbra(ket.
[] ( (mnect the red and bla(k leads t() the
outside terminals and the white lead t() the
(enter temfinal.
[] Aua(h tlle green lead below the jun(tion
blo(k with the ground screw tllat was
removed earlier (step 3).
[] Push tile strain relief upward (to relim_e
strain) while tightening tlle strain relief
clamp.
Loading ...
Loading ...
Loading ...