Loading ...
Loading ...
Loading ...
STEP 2. Remove hold-down screw and
terminal block cover.
Hold-downscrew
STEP 4a. Piace the hook-shaped end
of the wire over the terminal block screw.
The open siJe of the hook should face
to the right. Squeeze hook end of ,,wire
together to form a loop.
Terminalblockcover
STEP 3. Attach 3/4"U.L.-listed strain
relief (U.L. marking on strain relief) to
the hole below terminal block opening.
Put the direct wire cable through the
strain relief.
STEP 4. Loosen or remove terminal block
screws. Connect the neutral wire (white
or center) of direct wire cable under the
center screw of the terminal block.
STEP 5. Connect the other two wires
to outer terminal block screws using the
same method(s) described in STEP 4a.
Tighten all terminal block screws firmly.
STEP 6. Tighten the strain relief screws.
STEP 7. Insert tab of terminal block
cover into slot of the dryer rear panel.
Secure cover with hold-down screw.
Continue Installation on Page 16.
Externalground
connector
Centersilver-colored
terminalblockscrew
White
wire
Neutral grounding
wire (green/yellow)
Strain relief
3-Wire Connection with Direct Wire
11
Loading ...
Loading ...
Loading ...