Monogram ZEP30F 30" Stainless Steel Smart Flush Hearth Oven RSS

INSTALLATION INSTRUCTIONS - Page 18

For ZEP30F.

PDF File Manual, 60 pages, Read Online | Download pdf file

Loading ...
Loading ...
Loading ...
18 31-2001053 Rev. 0
Installations
1
L
HEARTH OVEN OVER STEAM OVEN – FLUSH-INSET INSTALLATION WITH A
2” PLATFORM BETWEEN
A
45” is the required minimum installation height. Oven
may be installed higher based on owner preference.
B
Hearth Oven Platform must be able to support
200 lbs. (91kg).
C
Solid enclosure required on the top, bottom, left
side, right side and back. The back surface may
be drywall. Advanced fabrication and assembly
techniques are strongly encouraged to ensure
precise cabinet squareness and parallelism.
D
Junction box location: Must be flush with back
surface so as not to extend into the 24-15/16”
cabinet depth. Junction box may also be located in
an adjacent cabinet.
E
The front surface of the interior cleats shall be a
finished appearance surface.
F
An optional LOWER TRIM KIT may be installed
with a CUT OUT OPENING & BOTTOM CLEAT
height changes. Trim kit ZXSTEAM1 can be used
with a CUT OUT OPENING height of 20-3/8” and a
BOTTOM CLEAT height of 1-5/8”.
Please call 1-800-626-2000 with any questions.
G
The opening center line dimension is taken at the
FRONT OPENING of each enclosure.
H
Steam Oven bottom surface cleat is to be 5/8” thick
MDF fiber board or equivalent.
ELEC.
SEE NOTE D
ELEC.
HEARTH OVEN PLATFORM
SEE NOTE B
STEAM OVEN PLATFORM
SEE NOTE H
4
1
2
"
10"
5
1
4
"
9
1
2
"
45" MIN
30"
CUTOUT WIDTH
30"
CUTOUT WIDTH
1
1
8
"
CLEAT
3
4
"
CLEAT
3
4
"
CLEAT
2
3
8
"
CLEAT
2
3
8
"
CLEAT
1"
CLEAT
23 17/32"
C
L
TO
C
L
SEE NOTE G
7
8
"
HEARTH OVEN
CLEAT SETBACK
1
1
2
"
STEAM OVEN
CLEAT SETBACK
24
15
16
"
CABINET DEPTH
2"
BETWEEN
CUTOUTS
5
8
"
MDF
SEE NOTE H
19
3
8
"
23
11
16
"
2
1
2
"
CLEAT
DEPTH
SECTION A-A
A
A
Loading ...
Loading ...
Loading ...