Fotile HYZK26-E1 Air Fryer

User Manual - Page 9

For HYZK26-E1. Also, The document are for others Fotile models: HYZK26-E2

PDF File Manual, 59 pages, Read Online | Download pdf file

HYZK26-E1 photo
Loading ...
Loading ...
Loading ...
-15-
-14-
WarningIf the oven fails to work normally after troubleshooting, please call FOTILE
Customer Service to arrange for service.
This product must be repaired by a professional technician authorized by
FOTILE to ensure safety and correct use. Failure to comply with this
direction, could result in voiding your warranty or causing property
damage and personal injury.
Faults Cause analysis Solution
Prolong cooking time.
Cause 1: Short cooking time.
Cut the food into smaller
pieces.
Cause 2: Excessive food volume.
Steam is
generated but
food cannot be
well cooked
Clean the drip tray with a towel.Cause 1: Water overflows in drip tray.
Check whether the water tank
is fully pushed into the tank
holder.
Cause 3: The water tank is not properly
installed.
Please contact FOTILE to get
service arranged.
Cause 4: Others.
Place the food at the middle and
bottom of the cavity as close as
possible to heating plate.
Cause 3: High food stacking layers.
The oven leaks
Check that there is no food or
debris in the way of the door
and if so, carefully remove it.
Cause 2: The door is not fully closed.
Steam is
generated but
food cannot be
well cooked
Choose multi-hole cooking ware
with short walls.
Please contact FOTILE to get
service arranged.
Cause 4: Inappropriate cooking ware.
Please call FOTILE after-sale
service hotline to get service
arranged.
Failed water pipeline system.
Fill the tank with an appropriate
amount of water.
Low water level for water tank.
Short circuit of cavity probe.
Display E2
Short circuit/open circuit of steam
generator NTC.
Display E3
Display F4
Add water please
Abnormal communication between
control panel and display panel.
Display F3
Open circuit of cavity probe.
Cause 5: Others.
Introduction of Product Diagram(HYZK26-E1)
Steaming and
Baking Rack
11
Wire rack
12
Door switch
9
Temperature probe
10
Upper heating element
3
Air heater apron
1
Door gasket
2
Humidity-controlled chip
7
Water tank with
drip tray
8
Control panel
5
Display
6
Steaming Rack
13
Door
14
7
6
5
8
3
4
2
1
9
10
11
13
14
12
Ventilation openings
4
Quick operation guide(HYZK26-E1)
1The control panel
1
5 4
9 8 11 10
7
6
2
312 13 14
Loading ...
Loading ...
Loading ...