GE - General Electric AZ75E09DACM1 GE zoneline air conditioner

User Manual - Page 18

For AZ75E09DACM1.

PDF File Manual, 28 pages, Download pdf file

Loading ...
Loading ...
Loading ...
Installation Instructions
WALL PLENUM AND ARCHITECTURAL LOUVER INSTALLATION
Install the appropriate wall plenum through the exterior wall in accordance with the Installation Instructions
provided with the plenmn.
IMPORTANT: The wall plenum is not designed to carry structural loads.
Proper wall header construction is required. The plenum requires proper
flashing, shim and caulk for a weather resistant installation.
Proper header for
structural support.
Apply proper caulking
and flashing.
Properly square and
lexel plenmn.
Architectural
Louver--RAVAL1
Exterior/0utside Wall
Wall Plenum
RAVWP6- 6"D x 19¾"VVx 32"14
RAVWP8- 8"D x 19¾"VVx 32"14
RAVWP12- 12"Dx 19¾"VVx 32"14 Case
RAVWP15- 15"Dx 19¾"Wx 32"14
[] BUILD AND INSTALL THE
ZONELINE BASE PLATFORM
1. Construct a 23V(' rain. x 23¼" rain. square pladimu.
NOTE: The platform must have a load-bearing
capacity of 175 lbs. minimum.
-..J
\S
8" rain:/
:;:de::m M'J __/'_Qlt0ut;pr drail,
COllll_CtlO[1
2. Place the platfimn in the utiliW closet with the
following clearance between it and the interior
surface of the walls/door/panel:
4" rain. ti'om front of the case - Unit to be
installed through FRONT of case
5" rain. fl'om front of the case - Unit to be
installed through SIDE of case
3" rain. fl'om two sides of the case
3. Align the platflmu with the oI)eniw,_ of
the wall plenum and secm'e to the floor
using appropriate brackets and bolts.
18
Loading ...
Loading ...
Loading ...