Loading ...
Loading ...
Loading ...
Installation and connection
66
Installation
Leveling the tumble dryer
Ensure that no closeable door,
sliding door, or an oppositely hinged
door is installed that would hinder
the door of the dryer being opened in
any way.
The appliance must stand perfectly
level to ensure safe and proper
operation.
The screw feet can be adjusted to
compensate for unevenness in the floor.
Downtime after installation
After installation, downtime of 1
hour is required before connecting
the tumble dryer to the electricity
supply.
Otherwise, the heat pump could be
damaged.
Ventilation
The cool air intake at the front of
the dryer must not be blocked or
covered. This would hinder a
sufficient intake of cool air for the
heat exchanger.
Do not block the gap between
the bottom of the tumble dryer and
the floor with toekicks, deep pile
carpet, etc. This would otherwise
hinder a sufficient flow of air to the
tumble dryer.
The hot air that is blown out from the
heat exchanger warms the room air.
Ensure sufficient ventilation of the
room: e.g., open the window. The
drying time will otherwise take longer
(higher energy requirement).
Before moving the tumble dryer
again
A small quantity of condensed water
that remains in the area around the
pump after the drying process can run
out if the dryer is tilted.
Recommendation: Start the Time Dry
program for approx. 1 minute before
transporting the dryer. Any remaining
condensed water will then be fed into
Loading ...
Loading ...
Loading ...