Loading ...
Loading ...
Loading ...
9
Installation of Tap Cooled System
Remove the top plug by twisting and pulling out, saving it for later use if you
decide to convert unit to an all-refrigerator.
Put the base of the tap cooled system to the top hole of unit.
Hold the base of the tap cooled system.
Use screwdriver to install 3 screws (included).
Install the pipe to the base of the tap cooled system.
Installation of the Beer Tower
Installation of the Beer Tower Gasket: Position the rubber (beer tower) gasket
directly on top of the cabinet aligning all four holes in the gasket with the four holes
on the cabinet.
Installation of the Beer Tower: Unravel the beer line (hose) from the tower and
insert the beer line and nut through the gasket and into the cabinet. Align the four
holes in the base of the beer tower, gasket and bayonet. The beer faucet should be
facing the front of the cabinet. (6:00 o'clock position) Using a Phillips screwdriver,
attach the beer tower to the cabinet using the four machine screws provided and
tighten firmly.
Installation of the Beer Tower Faucet Handle: Screw the black faucet handle
(clockwise) onto the beer tower faucet. Hand tighten only.
Installation of Protective Metal Plate
This plate should always be installed when the keg is in place to protect against
unnecessary damage to the floor of the cabinet.
Installation of the Beer Keg
Position the beer keg directly in front of the open door. Using keg handles only,
carefully lift the beer keg. (Figure 7)
To place the beer keg inside the cabinet, brace your knees behind the beer keg.
Lift the front of the keg just enough so the front edge of the keg is resting on the
front edge of the Beer Dispenser bottom cabinet. (Figure 8)
Grasp the keg handles and slide it all the way into the cabinet.
Figure 8
Figure 7
Loading ...
Loading ...
Loading ...