GE - General Electric BGC132-BI-N DCS Double Side Burner Built-In

User Manual - Page 12

For BGC132-BI-N.

PDF File Manual, 44 pages, Download pdf file

Loading ...
Loading ...
Loading ...
10
INSTALLATION
INSTALLATION OF SIDE BURNER, BUILTIN MODEL
All BGC131-BI and BGC132-BI models can be installed into a combustible enclosure with zero clearance from
the back, side and bottom below the counter top level as shown in Fig. 05.
A minimum of 6” from the back and sides must be maintained from the professional side burner above the
cooking surface (see Fig. 05).
When determining a suitable location, take into account concerns such as exposure to wind, proximity to traf-
fic paths, and keeping any gas supply lines as short as possible. Locate the side burner only in a well-ventilat-
ed area. Never locate the side burner in a garage, breezeway, shed, or other such enclosed areas.
It is recommended that ventilation holes are provided in the enclosure in the event of a gas leak. The counter
and supporting ledges or deck must be level and flat.
Important!
Gas fittings, regulator, and installer-supplied shut-off valves must be easily accessible.
FIG.05
COUNTER TOP
NON-COMBUSTIBLE
COMBUSTIBLE OR
6"
min.
6"
min.
6"
min.
BACK VIEW
COUNTER TOP
COUNTER TOP
NON-COMBUSTIBLE
COMBUSTIBLE OR
Loading ...
Loading ...
Loading ...