Loading ...
Loading ...
Loading ...
22
801710
MOVING AND TRANSPORT AFTER INSTALLATION
After every drying cycle, a small amount of condensed water will remain in the dryer. Switch on the
dryer and choose one of the programmes, then let the appliance operate for approximately half a
minute. This will pump out the remaining water and prevent damage to the dryer during transport.
If the dryer cannot be transported in the upright position, tilt it to the left side.
After transport, the dryer should be left to stand still for at least two hours before it is
connected to the power mains. The appliance should be installed and connected by a trained
technician.
If the appliance was not transported in compliance with the instructions, the dryer should be left
to stand still at least 24 hours before it is reconnected to the power mains.
Failure to do so may result in a heat pump failure which shall not be covered by the warranty.
Be careful not to damage the cooling system (see chapter »INSTALLATION AND CONNECTION/
Selecting the room«).
Carefully read the instructions for use before connecting the dryer. Repair or any warranty
claim resulting from incorrect connection or use of the dryer shall not be covered by the
warranty.
The belt may only be replaced by a service technician authorized by the manufacturer, who can
supply the original spare part with the code OPTIBELT EPH 1906, code 104265; OPTIBELT 8 EPH
1941, code 160165; POLY-V 7PH 1956 HUTCHINSON, code 562038; HUTCHINSON 8 PHE 1942,
šifra 270313 (depending on the model).
Loading ...
Loading ...
Loading ...