Loading ...
Loading ...
Loading ...
WALL HOOD INSTALLATION (continued)
1. Add 2” x 4” wood framing block to aid in securing the
top and rear of the hood to the wall. (See Figure 6)
2. To mount CFM300, CFM600 and CFM1200 fans within
hood walls. (See Figures 8, 9, 10 & 11)
3. Install the fan by aligning the fan holes with the PEM
studs on the back panel. Tighten the fan to the panel
using the hex nuts provided. (See Figures 8, 9, 10 & 11)
4. Connect the “Molex” from the fan to the “Molex” plug on
the hood. (See Figure 4 from previous page)
5. Attach three wires: black, white and green (#16 AWG) in
½” conduit from the service panel to the hood junction
box. Power supply must be rated for 120v, 60Hz, 15
amps (minimum).
6. Remove the junction box from the rough-in plate.
Connect black wire to power supplied black wire, white
wire to power supplied white wire and green wire to
ground supplied green wire.
7. Place all wiring connectors inside junction box.
OPTIONAL DUCT COVER
1. Install the hood as described in “Hood Rough-in Plate Mount” (Note:
Be sure to allow enough room for duct cover width on the top section
of the rough-in plate.
2. Slide duct cover into opening.
3. Attach Duct Cover from the inside of the hood through filter opening
using screws. (See Figure 7) Note: Do not completely tighten screws
until all components have been installed. At this point, check the
alignment of the duct to the hood. First tighten the four corners to
secure the duct, then tighten the remaining screws.
6
Loading ...
Loading ...
Loading ...