GE Zoneline RAKUVC2 UV-C Air Treatment Kit

User Manual - Page 8

For RAKUVC2. Also, The document are for others GE - General Electric models: RAKUVC1

PDF File Manual, 28 pages, Read Online | Download pdf file

RAKUVC2 photo
Loading ...
Loading ...
Loading ...
8
STEP 9:
Install the UVC Junction Box
5. Install the junction box assembly to the Main board cover. Insert the top and bottom tabs on the backside of the
junction box into the corresponding slots on the front of the main board cover.
6. Install the 5/16” Hi-Lo screw into the mating hole to secure the junction box to the main board cover.
7. Attach the junction box cover and secure with black 5/16” screw provided with kit.
8. If a junction box was previously installed in this unit, reuse the ground wire and ground screw.
9. If there was not a junction box previously installed, then remove ground wire from kit packaging and attach one end
to the hole in the front top left corner of the junction box with green ground screw.
10. Attach the other end of the screw to an existing ground location on the end bracket of the indoor coil.
11. Attach the white UVC led connector to the corresponding connector on the top of the junction box.
Installation Instructions
Junction Box
Assembly
Ground wire
attachment
LED
Connector
Attach the back
of the junction
ER[FRYHU¿UVW
Loading ...
Loading ...
Loading ...