Binder MKF 720 Dynamic climate chamber with humidity control, -liter capacity

User Manual - Page 33

For MKF 720.

PDF File Manual, 177 pages, Read Online | Download pdf file

Loading ...
Loading ...
Loading ...
MKF / MKFT (E5) 06/2020 page 33/176
4.3 Connection of cooling water outlet for water cooling (option for MKFT 720
and MKF)
An enclosure inside the chamber contains the connection kit for the cooling water inlet and outlet.
Fasten the cooling hose to the connection OUT” (16) on the rear of the chamber (screw thread ¾’’).
You can use a part of the supplied tap water hose as a drainage hose. In case another hose is used, it
has to be permanently resistant against max. 50 °C / 122 °F.
Protect both ends of the drainage hose with two of the four supplied hose clamps. Before turning on
the chamber, check the connection for leaks.
4.4 Connection of cooling water inlet for water cooling (option for MKFT 720
and MKF)
Connect the cooling water outlet before connecting the cooling water inlet.
Type of suitable water quality:
Water intake temperature: max. 10 °C / 50 °F.
pH value 4-7
connection pressure: 4 to 10 bar
BINDER GmbH is NOT responsible for the water quality at the user’s site.
Any problems and malfunctions that might arise following use of water of deviating quality is
excluded from liability by BINDER GmbH.
The warranty becomes void in the event of use of water of deviating quality.
Connection:
An enclosure inside the chamber contains the connection kit for the cooling water inlet and outlet.
Fasten the cooling water hose to the connection IN” (17) on the rear of the chamber (screw thread
¾’’).
Install the water supply connection using either the enclosed water hose or another pressure-resistant
one. To accomplish this, remove the cover of the freshwater connection IN” (17) on the rear of the
chamber.
The nominal diameter of the supplied water hose is ½ ", the length is 3m. The hose can be halved for
the inlet and the outlet.
The maximum hose length with nominal width ½ " is 5m. If a longer hose is necessary, a larger diame-
ter hose must be used
Protect both ends of the hose with two of the four supplied hose clamps. Before turning on the cham-
ber, check the connection for leaks.
Water consumption:
The average water demand is not helpful for the design of the water supply line, since the supply line
must provide sufficient dimensions for peak loads.
Peak values occur briefly (<5 min) when temperature rapidly decreases from + 180 ° C to a much lower
value. Also the activation of the condensation protection leads to high water consumption.
Max. water flow rate (peak value):
MKF / MKFT 720: approx. 2 m³/h
MKF 240: approx. 1 m³/h
MKF 115: approx. 0,8 m³/h
MKF 56: approx. 0,6 m³/h
Loading ...
Loading ...
Loading ...