Binder MKF 720 Dynamic climate chamber with humidity control, -liter capacity

User Manual - Page 32

For MKF 720.

PDF File Manual, 177 pages, Read Online | Download pdf file

Loading ...
Loading ...
Loading ...
MKF / MKFT (E5) 06/2020 page 32/176
To guarantee humidification during 24 hours even at high humidity set-points with manual
water supply, we recommend filling the freshwater can daily at the end of the day.
4.2.4 Water circle: lever for condensate recycling (option for MKF/MKFT 115, 240, 720)
Figure 11: Lever for condensate recycling (open position)
next to the freshwater can behind the maintenance access door
The lever (25) for condensate recycling is located behind the maintenance access door next to the fresh-
water can.
Open lever (vertical position): the condensate from the interior is conducted to the freshwater can. Use
only with clean interior!
Closed lever (horizontal position): the condensate is conducted to the wastewater connection. Use this
position in case of soiling / contamination of the interior.
NOTICE
Danger of soiling of the vapor humidification system.
Damage to the chamber.
Conduct the condensate to the wastewater connection in case of soiling / contamina-
tion of the interior (horizontal lever position).
Any problems and malfunctions that might arise due to insufficient water quality following con-
densate recycling are excluded from liability by BINDER GmbH.
(25)
Loading ...
Loading ...
Loading ...