Loading ...
Loading ...
Loading ...
14
Step 3 Position the Gate Bracket
NOTE: It may be necessary to attach horizontal reinforcement to the gate before attaching the gate bracket.
1. Position the operator arm onto the output shaft so that the pin slides into the slot.
2. Measure 46" (116.8 cm) or Distance A if using the chart installation, along the gate length from the gate hinge center.
3. Measure 27.5" (69.9 cm) up from the concrete pad to the gate hinge position on the gate as shown.
4. Make sure the operator arm is level and tack weld the gate bracket in this position. Use a clamp to temporarily hold the arm in place while determining
the correct measurements.
Output Shaft
Pin
Slot
Gate
Hinge
Center
46" (116.8 cm) or Distance A
Tack weld
27.5"
(69.9 cm)
Step 4 Adjust the Operator Arm
Length
NOTE: The length of the arm can be adjusted if necessary. If adjusting the
length, ensure that both sections of the arm are adjusted proportionally.
Use a clamp to temporarily hold the arm in place while determining the
correct measurements.
1. Close the gate and measure the distance of the operator arm from the
gate bracket to the output shaft center. This distance is E.
2. Open the gate 90° (do not allow arms to scissor when open).
Measure both sections of the arm (D and C). The arm lengths are
correct as long as C+D=E (arm should be perpendicular to the gate
in the open position as shown).
Top view - closed gate
Top view - open gate
Gate
Open
90°
Output Shaft
2
1
Output Shaft
E
C
D
INSTALLATION
Loading ...
Loading ...
Loading ...