DB AT1 Parallel Connection Cable BLUETTI

Product's Documents

Below are documents related to this product, you can read online or download:
DB photo

User Manual

This is the main product document for model DB.

The file format is pdf, 60 pages, you can download this manual here .

background
AT1
Smart Distribution Panel
User Manual V2.2
Important Instructions
For optimal performance, update your unit to the latest
firmware before first use.
See the appendix "Update Firmware via BLUETTI App"
for guidance.
Read and understand this manual before use and keep
it handy for future reference.
background
Legal Information
Copyright © 2025 ShenzhenPowerOakNewenerCo., Ltd. All rights reserved.
No part of this document may be reproduced or transmitted in any form or by any
means without the prior written consent of ShenzhenPowerOakNewenerCo., Ltd.
Note: AT1 supports an optional 4G module. For AT1S, the 4G module, antenna, and adapter
cable are in the package. All other hardware components are identical.
background
Shenzhen PowerOak Newener Co., Ltd.
F19, BLD No.1, Kaidaer Tongsha Rd No.168, Xili Street, Nanshan Shenzhen China
Website: https://www.bluettipower.com/
Notice
BLUETTI's products, services, and features are subject to the agreed-upon terms and
conditions during purchase. Please note that some products, services, or features
described in this manual may not be available under your purchase contract. Unless
otherwise specified in the contract, BLUETTI makes no representations or warranties of
any kind, express or implied, with respect to the contents of this manual.
The contents of this manual are subject to change without notice. Please get the latest
version from: https://www.bluettipower.com/pages/user-guides
If you have any questions or concerns about this manual, please contact BLUETTI
support for further assistance.
Symbol Conventions
This manual uses the following symbols to highlight important information:
Danger
Warning
Attention
Instruction
It indicates a hazardous situation which, if not avoided, will result in death or
serious injury.
It indicates a hazardous situation which, if not avoided, could result in
death or serious injury.
It indicates a potentially hazardous situation which, if not avoided, could
cause substantial damage to property and the environment.
It contains important additional information as well as useful tips for safe,
efficient and hassle-free operation of the AT1 smart distribution panel.
background
1. Safety Information
1.1 Important Guidelines
1.2 Instructions Pertaining to Risk of Fire, Electric Shock, or Injury to Persons
1.3 Usage Guidelines
2. Packing List
2.1 What's in the Box
2.2 What You'll Need
3. Introduction
4. Key Features
5. Working Modes
5.1 Backup Mode (Default)
5.2 Self-consumption Mode
5.3 Time of Use Mode
5.4 Custom Mode
6. Overview
6.1 User Panel
6.2 Electrician Panel
6.3 LED Indicators
6.4 Signal Panel
7. Installation
7.1 Applications
7.2 Before You Install
7.3 Prepare the Necessary Tools
7.4 Mounting the AT1
7.5 Breaker Installation
7.6 Cable Installation
7.7 System Wiring
7.8 Other Components
8. System Commissioning
9. Specifications
10. Troubleshooting
FAQs (Frequently Asked Questions)
Appendix
Compliance
Contents
05
05
06
06
07
07
07
08
09
11
11
12
12
13
14
14
15
16
16
18
18
19
20
22
28
30
34
49
51
52
53
53
54
56
background
1.1 Important Guidelines
For optimal performance and safety, please follow these essential guidelines:
• Always operate and store the product in the conditions specified in this manual.
• Ensure the product is used in compliance with all relevant standards and regulations.
• Avoid unauthorized modifications, disassembly, or software changes.
• Read all instructions and warnings for this product.
BLUETTI is not liable for the following situations or any resulting consequences:
• Damage caused by natural disasters, including earthquakes, fires, floods, storms, or
mudslides.
• Damage that occurs during customer-handled transportation.
• Issues caused by improper storage or use outside the conditions specified in this
manual.
• Damage caused by customer negligence, misuse, or intentional harm.
• Damage caused by third-party actions, including improper handling, usage, or installation
not in line with this manual.
• Damage or issues caused by unauthorized repairs, adjustments, or removal of product
labels.
• Damage or safety risks caused by using non-BLUETTI-approved devices to power this
product.
• Accidents or safety concerns arising from using the product in critical applications, such
as nuclear, aviation, or medical fields, where high reliability is essential for personal
safety or operation.
1. Safety Information
Before using this product, please read the manual carefully and follow all safety instructions.
Pay close attention to the Dangers, Warnings, Attentions, Notes, and other safety labels
in the manual and on the product itself. If you have any questions or encounter a
situation not addressed in this manual, please contact us. Improper use or unauthorized
operation may result in damage or injury, which is not covered by the warranty.
ALWAYS SHARE EXCELLENCE 05
EN
background
• Do not clean the product with water.
• Keep the product away from heat sources or high-temperature environments.
• Never use the product near open flames, explosive gases, or in environments with
smoke, vapors, or other hazardous conditions.
• Do not operate the product while damp. Ensure the product is fully dry before use.
• Do not open or modify the product yourself. Only qualified personnel should perform
repairs or replace parts using BLUETTI-approved components and cables to prevent the
risk of fire, electric shock, or other personal injury.
1.2 Instructions Pertaining to Risk of Fire, Electric Shock, or Injury to Persons
1.3 Usage Guidelines
• Ensure all screws are securely tightened.
• Ensure the product is firmly installed before use.
SAVE THESE INSTRUCTIONS
Danger
To ensure safe operation, please follow the instructions below.
EN
ALWAYS SHARE EXCELLENCE
06
background
2. Packing List
2.1 What's in the Box
2.2 What You'll Need
AT1
Smart Distribution Panel
Phillips Hex Washer
Self-Tapping Screw
×4
Expansion Bolt
×4
Ethernet Cable
(32.8 ft/10 m)
Antenna PCB Terminal Block
User Manual,
Warranty Card,
QC Certificate
Circuit Breaker
(for AC-Coupled PV,
generator, smart load, ESS)
Circuit Breaker
(for grid and backup load)
Rapid Shutdown Switch
(normally open)
Elite 100 V2
Portable Power Station
User Manual
V2.0
Important Instructions
For optimal performance, update your unit to the latest
firmware before first use.
See the appendix "Update Firmware via BLUETTI App"
for guidance.
Read and understand this manual before use and keep
it handy for future reference.
ALWAYS SHARE EXCELLENCE 07
EN
background
3. Introduction
The AT1 smart distribution panel manages your home power system with a built-in
energy management system (EMS), along with distribution and communication
modules. Additionally, it seamlessly switches to backup power when needed.
Key Features
• Manages energy flow based on your settings.
• Shows input source status.
• Easy control via the BLUETTI app.
Overview
Door
User Panel
Fig. 3-1 AT1 smart distribution panel
EN
ALWAYS SHARE EXCELLENCE
08
background
4. Key Features
Extreme Weather Alert
When enabled, the AT1’s energy management system (EMS) will notify you as soon as a
weather alert is received from the cloud. You can choose how the system should
respond:
• Activate Backup Mode: The system automatically switches to Backup Mode during the
storm to prepare for possible outages. Once the weather clears, it will return to normal.
• No Action: If no response is given, the Backup Mode will turn on automatically.
• Decline Backup Mode: The system stays in its current mode. You'll still receive future
alerts as long as this feature remains enabled.
Auto On/Off-Grid Switching
If the grid experiences instability (voltage or frequency issues), the AT1 seamlessly
switches to off-grid mode. It powers your household appliances using solar, a generator
(if connected), and stored energy from the energy storage system. Once the grid is
restored, it automatically reconnects and intelligently balances energy from the grid,
solar, and energy storage to keep your home running smoothly.
Maximize Solar Power
The AT1 prioritizes using AC-coupled solar power to run your home. If grid feed-in is
enabled, any excess power charges the ESS battery, and the rest goes to the grid for
possible earnings. If grid feed-in is off and the battery is full, AT1 will automatically stops
the solar input to prevent any unintended power export to the grid.
Sleep Mode
If both grid and solar power are unavailable, and the ESS battery is fully drained, the AT1
will shut down and ESS will enter sleep mode, awaiting a restart.
Black Start
• Auto Black Start
The ESS can automatically restart after a full shutdown when certain conditions are met:
Grid Restored: The system automatically powers back on as soon as grid power returns.
DC-Coupled Solar Available: For models like the EnergyPro 13K, if DC-coupled solar input
is active and the battery is in a normal state, the system will auto-start.
Sufficient AC-Coupled Solar Power: When solar energy is sufficient and both the ESS
and AC-coupled solar system meet startup conditions, the system will automatically
start if Black Start is enabled in the app. The AT1 will also activate AC-coupled solar
system to power the system.
ALWAYS SHARE EXCELLENCE 09
EN
background
Generator Connected: If a generator is connected and allowed (via app settings) to
charge the ESS during backup mode, the system will automatically start. Otherwise, the
generator will power your loads during outages only.
If the system doesn’t restart on its own and no errors are shown, you can also start it
manually using the app.
• Manual Black Start
When the solar is sufficient, you can restart the system anytime via the BLUETTI app.
To begin:
1. Make sure the ESS breaker connected to your ESS is turned ON.
2. Set the AT1 backup load breaker to OFF to disconnect all loads, including those
connected to the ESS.
Once the battery reaches at least 20% SoC, you can turn the AT1 backup load breaker
back to ON and reconnect your loads.
Attention: If loads remain connected during startup, the battery may drop to 0% SoC
and continue to discharge, which may cause irreversible damage.
Real-Time Power Management
The AT1 system can intelligently manage power from multiple sources—grid, generator,
EV charger, and ESS—based on real-time load demand and system settings.
• When set to discharge first in Custom mode, the ESS delivers up to its maximum
output. If your usage goes beyond that, the grid automatically covers the rest.
• If the ESS operates in off-grid and the battery drops below your set limit, the AT1 will
automatically start the generator. It powers your home and recharges the battery
based on your settings. Once the grid is back, AT1 smoothly switches over and turns off
the generator.
• During an outage, the connected EV charger can keep your home running and may
even recharge your ESS, depending on your setup.
• Smart loads can be powered by the grid, solar, or ESS via the smart load port. AT1
balanced the power output based on the current working mode.
EN
ALWAYS SHARE EXCELLENCE
10
background
5. Working Modes
The AT1 smart distribution panel supports four working modes. You can select your
preferred mode in the BLUETTI app, based on your energy setup and daily needs.
Working Mode
Self-consumption Time of UseBackup Custom
5.1 Backup Mode (Default)
In Backup Mode, the whole system acts as a reliable home backup power source that
only kicks in when the grid fails. It prioritizes the use of solar energy over the grid to
charge batteries, making it an environmentally friendly and sustainable choice for
home energy plans. With ample energy reserves, it provides a seamless power supply,
perfect for areas with unreliable grids.
Input power
from grid
Time
Time
Backup
output power
(W)
(W)
Fig. 5-1
Instruction
The introduction highlights the key features and components of
the AT1.
ALWAYS SHARE EXCELLENCE 11
EN
background
5.2 Self-consumption Mode
In this mode, the AT1 prioritizes using solar energy directly to meet immediate household
needs. Any surplus solar energy generated is intelligently stored in battery packs for use
during peak hours or in case of a power outage. This approach ensures a reliable and
efficient power supply, reducing dependence on the grid and promoting energy
independence.
5.3 Time of Use Mode
Optimized for regions with varying electricity costs and a reliable power grid, this mode
allows users to customize charging schedules. When electricity rates peak, set the
system to discharge, using solar and battery power to meet energy needs. Conversely, in
low-rate periods, schedule the grid to charge the battery packs while using the solar
energy and grid power to supply the needs. Users can also adjust State of Charge (SoC)
limits to manage grid power use by the ESS while preserving battery capacity for solar
energy. In off-grid scenarios, rely on solar and battery power to sustain the load.
Midnight
Time
Morning Noon Afternoon Evening
Household
runs on ESS
Household
runs on
ESS
+ solar
Direct consumption > Storage
Household runs on solar
PV generation
Household consumption
Household
runs on
ESS + solar
Household
runs on
ESS
Electricity Price
Household Consumption
0:00 6:00 12:00 18:00 24:00
Fig. 5-2
Fig. 5-3
EN
ALWAYS SHARE EXCELLENCE
12
background
5.4 Custom Mode
In this mode, users can set preferred SoC limits, discharge schedule, and whether to use
grid charging or discharging. AT1 will automatically handle power distribution, battery
charging, and solar allocation.
To feed the power into the grid, turn on the Feed Into Grid switch in the app and set
your desired discharge power.
2:00
Time
6:00 12:00 18:00 22:00
PV generation
Household consumption
Household
runs on ESS
Household
runs on
ESS
+ solar
Direct consumption > Storage
Household runs on solar
Household
runs on
ESS + solar
Household
runs on ESS
Fig. 5-4
ALWAYS SHARE EXCELLENCE 13
EN
background
6. Overview
6.1 User Panel
Grid Breaker Slot*
Essential Load Breaker Slot* (Backup)
System Switch
AC PV Breaker Slot*
Generator Breaker Slot*
Smart Load Breaker Slot*
ESS Breaker Slot 1*
ESS Breaker Slot 2*
Indicators
Panel Handle
①
②
③
④
⑤
⑥
⑦
⑧
⑨
⑩
* To install a breaker, remove the knockout first. If unused, leave the knockout in place. If
removed by mistake, simply re-cover it with a replacement slot cover (sold separately).
1
4
5
6
7
8
10
3
9
2
Fig. 6-1
EN
ALWAYS SHARE EXCELLENCE
14
background
6.2 Electrician Panel
4
5
6
7
8
11
12
1
3
2
9
10
13
14
15
L2 L1
L1
L2
OFF
ON
OFF
ON
Grid Breaker*
Backup Load Breaker*
System Switch
AC PV Breaker*
Generator Breaker*
Smart Load Breaker*
ESS Breaker 1*
ESS Breaker 2
Indicators
Grid ATS**
Neutral Busbar (N)
Ground Busbar (PE)
Signal Panel
WiFi & Bluetooth Antenna
4G Antenna Port (Optional)
①
②
③
④
⑤
⑥
⑦
⑧
⑨
⑩
⑪
⑫
⑬
⑭
⑮
* Provided and installed by a licensed electrician.
** After power failure, the switch will automatically jump to the OFF position. Otherwise,
it means that the equipment has failed and you need to manually switch it to the OFF
position and check the equipment.
Fig. 6-2
ALWAYS SHARE EXCELLENCE 15
EN
background
6.4 Signal Panel
Indicators
SIM Card Slot
ESS COM Port (RJ45)
Ethernet Port (RJ45)
USB Port
Dry Contact Terminal
RS485 Terminal
Digital Signal Terminal
WiFi & Bluetooth Chip*
4G Module*
①
②
③
④
⑤
⑥
⑦
⑧
⑨
⑩
5
9
10
8
1
3
4
7
6
2
1
1
1
3
3
6 1
8
Fig. 6-4
Fig. 6-3
6.3 LED Indicators
Steady
Off
Steady
Off
Quick flash with pauses
Steady
Slow flash
Rapid flash
Rapid flash
Slow flash
Off
Grid power on
Grid power off
Backup power on
Backup power off
App Bluetooth connected
App cloud connected
Internet connected, app cloud not responding
Internet disconnected
Relay issue or protection
Inverter issue
Normal operation
Indicators Status Description
Grid
(Green)
Backup
(Green)
Comm
(Green)
Error
(Red)
Grid
BackUp
Comm
Error
EN
ALWAYS SHARE EXCELLENCE
16
* External antenna required.
background
1
2
3
4
5
6
7
8
No. Description
\
NC
COMM
NO
Floating terminal
For generators only. By default, COMM is connected to NC
and not to NO.
Name
8
7
6
5
4
3
2
1
3
2
1
3
2
1
DO_1
DO_2
Reserved ports – normally open; close when triggered
Reserved ports – normally open; close when triggered
1
2
3
4
5
6
No. Description
DI1+
DI1-
DI2+
DI2-
RSD+
RSD-
Connect a normally open Rapid Shutdown Switch.
Press to shut down all power circuits immediately.
Name
Reserved ports
Reserved ports
1
2
3
1
2
3
No. Description
485A1+
485B1-
\
485A2+
485B2-
\
Reserved for third-party EV charger
NameCommunication Device
Reserved for third-party meter
AC Meter
EV Charger
AC MeterEV Charger
Fig. 6-6
Fig. 6-5
ALWAYS SHARE EXCELLENCE 17
EN
6.4.1 Dry Contact Terminal
6.4.2 RS485 Communication Terminal
6.4.3 Digital Signal Terminal
Fig. 6-7
654321
background
7. Installation
7.1 Applications
The AT1 works with both whole-home and partial backup setups. Choose the one that
fits your energy needs during installation.
• Whole-Home Backup
All household loads, except those on smart circuit, are routed through the main panel to
the AT1's backup port. If the grid goes down, the ESS keeps your entire home stay
powered.
• Partial Backup
During setup, select the loads you want to keep running during an outage. Connect
them to the AT1's Backup port, excluding smart circuit loads. All other loads will be
considered as non-essential and should be connected to the grid-side panel. When the
grid goes down, the ESS keeps your backup loads powered.
Fig. 7-1 Whole-home backup
AT1
Solar Panels
(AC-Coupled PV)
Micro
Combiner
Microinversters
Essential loads
EMS
ESS
Utility Meter
Generator (Optional)
Heavy Loads
Smart Load Control (Optional)Essential loads
Utility Grid
Main
Panel
Solar Panels
(DC Input)
EN
ALWAYS SHARE EXCELLENCE
18
background
7.2 Before You Install
Attention: Installation must comply with all relevant local or regional electrical regulations.
• The AT1 smart distribution panel can be integrated with the grid.
• Follow local requirements like National Electrical Code
®
(NEC) ANSI/NFPA 70 standards
for isolating and interconnecting AC circuits between the AT1 and other devices.
• Ensure your setup complies with all grid connection rules.
• Use copper conductors only. Choose conductor size, insulation rating, and installation
method according to local standards for temperature, current, and efficiency.
• AC and DC circuits are isolated from the panel enclosure. If NEC Section 250 applies,
grounding must be completed by the installer.
• Make sure the grid voltage stays within the allowed range for the system.
For detailed wiring, please refer to the Chapter 7.7.
Fig. 7-2 Partial backup
AT1
Solar Panels
(AC-Coupled PV)
Micro
Combiner
Microinversters
Essential loads
EMS
Generator (Optional)
Heavy Loads
Smart Load Control (Optional)
Utility Meter Utility Grid
Essential loads
Main
Panel
Solar Panels
(DC Input)
ESS
Non-Essential loads
Sub
Panel
Warning
• Where required, install smoke detectors or fire protection equipment
according to local building and fire codes.
• Do not install the AT1 in occupied residential or living spaces.
• Install it in a dry location, away from flood-prone areas.
• If installed near garages or vehicles, mount it off the driving path—ideally
above bumper height or on a side wall.
• Keep the unit away from water sources such as downpipes, sprinklers, taps,
or any other plumbing fixtures.
ALWAYS SHARE EXCELLENCE 19
EN
background
Table 7-1
7.3 Prepare the Necessary Tools
1
2
3
Electric drill
Socket wrench set
Allen wrench set
No. DescriptionPicture
4
5
6
7
8
9
Torque wrench
Flat screwdriver
Cross screwdriver
Cable cutter (for power cables)
Cable stripper (for signal wires)
Cable crimper (for signal wires)
Warning
• Ensure snow buildup does not block the panel.
• Always shut off power before installing, removing, or adjusting current
transformers (CTs). Never work on live circuits.
• When powered by photovoltaic systems, the AT1 must not be installed within
the PV array boundary, as defined by NEC Article 690.
EN
ALWAYS SHARE EXCELLENCE
20
background
10
11
12
13
14
15
16
17
18
19
20
21
22
Combination pliers
Needle-nose pliers
Hammer
Multimeter
Marker
Measuring tape
Level
Box cutter
Heat shrink tubing
Heat gun
Cable tie
Anti-static gloves
Safety helmet
No. DescriptionPicture
ALWAYS SHARE EXCELLENCE 21
EN
background
7.4 Mounting the AT1
7.4.1 Environment Requirements
• Choose a dry, clean and stable wall surface for installation. Avoid areas with clay, soft soil,
or spots that could sink over time.
• Do not install the system in low-lying areas prone to water and snow accumulation to
prevent water ingress and result in system failure.
• Ensure the installation site is elevated above historical high water levels.
• The AT1 can be installed indoors and outdoors. If installed outdoors, use a high-quality
shelter or waterproof cover to protect it from direct sunlight and rain for safe and stable
operation.
• Keep the equipment away from flammable liquids, gases, or explosive materials.
• Keep away from children and pets.
• Do not install the AT1 in coastal areas where salt accumulation could cause corrosion.
This includes areas within 1,642 ft (500 m) from the coast or places exposed to sea
breezes. Salt accumulation can be influenced by seawater, humidity, precipitation, air
moisture, and local geography.
• Install the AT1 in a well-ventilated and spacious area to ensure good heat dissipation.
23
24
25
26
Protective goggle
Mask
Safety-toe shoes
Vacuum cleaner
No. DescriptionPicture
EN
ALWAYS SHARE EXCELLENCE
22
background
7.4.2 Location Requirements
• Install the AT1 on a sturdy, flat, and level surface.
• Do not install the system on flammable materials and keep it away from water pipes
and cable conduits.
• Consider the weight and placement and placement of components to ensure
adequate structural support.
7.4.3 Space Requirements
Leave at least 10 inches (25 cm) above, and position the bottom 41 to 45 inches (1.04 to
1.14 meters) from the floor. Keep at least 36 inches (91 cm) of open space in front for safe
and easy operation.
Once you’ve chosen the location, mark the drilling holes on the wall based on the
mounting holes on the back of the unit.
Note: Place a piece of cardboard against the rear of AT1, trace the hole positions, and use
it as a guide for drilling.
Fire or
Flammable
Material
Water
.BYo
Fig. 7-3
ALWAYS SHARE EXCELLENCE 23
EN
background
7.4.4 Remove the Door and Front Panel
Step 1: Unscrew the six Phillips screws—two each at the top, middle, and bottom—to
detach the door.
Attention: Remove the screws on the hinge attached to the unit side. This helps avoid
scratches during installation.
Step 2: Remove the five M4 Phillips screws on the front panel, then lift it off.
Note: Do not install breakers or connect any cables before mounting the unit.
AT1 to ESS
AT1 to Generator
Connection
32.8 ft (10 m)
98.4 ft (30 m)
Max. Cable Length
Table 7-2 Maximum Cable Lengths for Data Connections
Danger
Make sure to check for any cables or pipes before drilling into the wall.
Fig. 7-4
Warning
• Fully cover all internal components before drilling. Remove any debris before
wiring or installing devices.
• Cover the top vents during drilling to keep dust and debris out.
• Installation must comply with local codes and standards. Where applicable,
the final installation method and spacing must follow the licensed structural
engineering design.
EN
ALWAYS SHARE EXCELLENCE
24
ш 10 in
41 in to 45 in
ш 36 in
Ground
Wall
ESS 1
ESS 2
ESS N
AT1
background
Cross-section B-B
Cross-section C-C
Cross-section A-A
1
1
2
1
1
3
7.4.5 Choose the Cable Entry
Step 1: Decide if the cables will be routed from either side or from the back of the AT1
smart distribution panel.
Step 2: Use the proper conduit fittings or cable seals to fully seal each entry point.
Attention: Once the cable entry is punched open, it cannot be undone. Do not drill into
any metal surface other than the designated cable entries.
Step 3: To remove a knockout, place a slotted screwdriver on the edge of the knockout
(not the center), from the outside of the unit.
Step 4: Give the screwdriver a firm tap with a hammer. One solid hit is usually enough.
Note: Striking the edge makes it easier to remove the knockout and requires less force
than hitting the center.
①
②
③ (with seal plugs)
Knockout
1/2
2 or 1/2
2
Trade Size (Unit: in)
Remove the door.
Remove the front panel.
Ensure that the hinges
are on the door side.
Fig. 7-5
Table 7-3 AT1 conduct dimensions
ALWAYS SHARE EXCELLENCE 25
EN
background
Step 5: Check your local electrical codes and box fill limits to choose the correct size and
number of conduits. An adapter may be needed to properly connect the conduit to the
AT1 wiring compartment.
Note: If using rear cable entry, make sure the conduit holes are aligned with the AT1's
mounting points—refer to the diagram for guidance. The knockout layout is the same
for both rear and side entry.
23.6 in
600 mm
35.8 in
910 mm
16 in
406 mm
3.8 in
97 mm
2.5 in
64 mm
2.6 in
66 mm
30.7 in
780 mm
Fig. 7-7
Fig. 7-8
EN
ALWAYS SHARE EXCELLENCE26
background
7.4.6 Mounting
Have at least two people for safe mounting.
One person should hold the AT1 in place at the desired height.
The other secures it by tightening four self-tapping screws into the corners of the AT1.
Note: For best results, run cables through the bottom of the unit. If using a top entry,
make sure it’s fully sealed to prevent water ingress.
Fig. 7-9
ALWAYS SHARE EXCELLENCE 27
EN
background
Important Notes
• Install breakers for the AC-coupled solar system (AC PV), generator, smart load, and
ESSs based on your setup. DO NOT connect their power cables directly to the busbar
without a breaker.
• Use the AC PV breaker to connect microinverters to the AT1. Some microinverters may
not be fully compatible with BLUETTI systems, please contact BLUETTI support for
details.
• Use the generator breaker to connect a generator. Make sure the peak current doesn't
exceed 80 A to avoid overload or tripping.
• Use the smart load breaker for smart loads like EV chargers.
• Use the ESS breakers to connect BLUETTI energy storage equipment (e.g., EnergyPro
13K, EnergyPro 6K, Apex 300). For more details, please contact BLUETTI support.
• Install the grid and backup load breakers according to your needs. If not in use, you can
directly connect the power cable to the terminal.
7.5 Breaker Installation
7.5.1 Recommended Breaker and Wire Gauge
1
2
3
4
5
6
7
8
No.
Grid Breaker* (Connects to the main panel)
Backup Load Breaker*
System Switch
AC PV Breaker*
Generator Breaker*
Smart Load Breaker*
ESS Breaker 1*
ESS Breaker 2*
Name
L2 L1
L1
L2
OFF
ON
OFF
ON
4
3
2 1
5
6
7
8
* Provided and installed by a licensed electrician.
Application Max. OCPD Recommended Breaker
Siemens# Q***
Siemens# Q***H
Siemens# Q***
Siemens# Q***H
Siemens# Q***
Siemens# Q***H
2-Pole, 10 kAIC, 240 V
2-Pole, 22 kAIC, 240 V
2-Pole, 10 kAIC, 240 V
2-Pole, 22 kAIC, 240 V
2-Pole, 10 kAIC, 240 V
2-Pole, 22 kAIC, 240 V
20-80 A
20-80 A
20-80 A
Specs
AC-Coupled
Solar System
Smart Load
(ESS 3)
Generator
Fig. 7-10
EN
ALWAYS SHARE EXCELLENCE28
background
Application Max. OCPD Recommended Breaker
Siemens# Q***
Siemens# Q***H
Eaton# BW2200
Eaton# BWH2200N
Eaton# BW2200
Eaton# BWH2200N
Siemens# Q220
Siemens# Q230
Siemens# Q240
Siemens# Q250
Siemens# Q260
Siemens# Q270
Siemens# Q280
Siemens# Q290
Siemens# Q2100
Eaton# BW2200
Siemens# Q220H
Siemens# Q230H
Siemens# Q240H
Siemens# Q250H
Siemens# Q260H
Siemens# Q270H
Siemens# Q280H
Siemens# Q290H
Siemens# Q2100H
Eaton# BWH2200N
2-Pole, 10 kAIC, 240 V
2-Pole, 22 kAIC, 240 V
2-Pole, 10 kAIC, 200 A/240 V
2-Pole, 25 kAIC, 200 A/240 V
2-Pole, 10 kAIC, 200 A/240 V
2-Pole, 25 kAIC, 200 A/240 V
2-Pole, 10 kAIC, 20 A/240 V
2-Pole, 10 kAIC, 30 A/240 V
2-Pole, 10 kAIC, 40 A/240 V
2-Pole, 10 kAIC, 50 A/240 V
2-Pole, 10 kAIC, 60 A/240 V
2-Pole, 10 kAIC, 70 A/240 V
2-Pole, 10 kAIC, 80 A/240 V
2-Pole, 10 kAIC, 90 A/240 V
2-Pole, 10 kAIC, 100 A/240 V
2-Pole, 10 kAIC, 200 A/240 V
2-Pole, 22 kAIC, 20 A/240 V
2-Pole, 22 kAIC, 30 A/240 V
2-Pole, 22 kAIC, 40 A/240 V
2-Pole, 22 kAIC, 50 A/240 V
2-Pole, 22 kAIC, 60 A/240 V
2-Pole, 22 kAIC, 70 A/240 V
2-Pole, 22 kAIC, 80 A/240 V
2-Pole, 22 kAIC, 90 A/240 V
2-Pole, 22 kAIC, 100 A/240 V
2-Pole, 25 kAIC, 200 A/240 V
14 AWG
10 AWG
8 AWG
8 AWG
6 AWG
4 AWG
4 AWG
3 AWG
3 AWG
3/0 AWG
14 AWG
10 AWG
8 AWG
8 AWG
6 AWG
4 AWG
4 AWG
3 AWG
3 AWG
3/0 AWG
16 A
24 A
32 A
40 A
48 A
56 A
64 A
72 A
80 A
160 A
16 A
24 A
32 A
40 A
48 A
56 A
64 A
72 A
80 A
160 A
20 A
30 A
40 A
50 A
60 A
70 A
80 A
90 A
100 A
200 A
20 A
30 A
40 A
50 A
60 A
70 A
80 A
90 A
100 A
200 A
20-100 A
200 A
200 A
Specs
Max. Continuous
Current
Max.
OCPD
Breaker Breaker Specs
Recommended
Wire Gauge*
ESS
(ESS 1/ESS 2)
Backup Load
Grid
* Copper wire required.
ALWAYS SHARE EXCELLENCE 29
EN
background
7.5.2 Maximum Current of ESS Configurations
Choose the appropriate breaker and cable based on the maximum continuous current
of multiple ESS units connected to the AT1. For details, see Chapter 7.5.1.
ESS Model
Units in Parallel
(per branch)
Max. Continuous
Current
56 A
24 A
48 A
72 A
50 A
1
1
2
3
1
2
3
70 A
30 A
60 A
90 A
62.5 A
Max. OCPD
EnergyPro 13K
Apex 300
EnergyPro 6K
7.6 Cable Installation
7.6.1 Connecting the AC-Coupled Solar System
Connect the AC-coupled solar system such as solar inverter to the AT1 using the AC PV
breaker only.
L2 L1
L1
L2
L1
L2
Neutral
Ground
Fig. 7-11
EN
ALWAYS SHARE EXCELLENCE30
background
7.6.2 Connecting the Generator
7.6.3 Connecting the Smart Load
L2 L1
L1
L2
L1
L2
Neutral
Ground
L2 L1
L1
L2
L1
L2
Neutral
Ground
Fig. 7-12
Fig. 7-13
ALWAYS SHARE EXCELLENCE 31
EN
background
7.6.4 Connecting the Energy Storage System (ESS)
Connect the ESS to the AT1 as shown below.
Attention: Only connect the ESS of the same model to a single AT1. For setup guidance,
please contact BLUETTI support.
7.6.5 Connecting the Backup Load
Connect the backup conductors to the AT1 terminals using the recommended cables.
Once the essential load breaker is installed, the layout changes—L2 will be on the left,
and L1 on the right.
L2 L1
L1
L2
L1
L2
Neutral
Ground
L2 L1
L1
L2
L1
L2
Neutral
Ground
Fig. 7-15 Connecting to ESS2
Fig. 7-16
Fig. 7-14 Connecting to ESS1
L1
L2
Neutral
Ground
L1
L2
Neutral
Ground
L2 L1
L1
L2
EN
ALWAYS SHARE EXCELLENCE
32
background
7.6.6 Connecting the Grid Supply
Connect the grid conductors to the AT1 terminals using the recommended cables.
Once the grid breaker is installed, the layout changes—L2 will be on the left, and L1 on
the right.
7.6.7 Neutral-Ground Bonding Jumper
• If the AT1 is installed as service equipment, the neutral and ground must be bonded,
following NFPA 70 250 Grounding and Bonding (Part V).
• Only remove the Neutral-Ground Bonding Jumper if the unit is not used as service
equipment or during testing.
Fig. 7-17
Fig. 7-18
L1
L2
Neutral
Ground
L1
L2
Neutral
Ground
L2 L1
L1
L2
ALWAYS SHARE EXCELLENCE 33
EN
background
7.7 System Wiring
7.7.1 System with Breaker
Fig. 7-19 Whole-home backup
Heavy Loads
Air
Conditioner
Pool Pump EV Charger
BLUETTI
ESS
BLUETTI
ESS
AT1 Smart Distribution Panel
Busbar
L1
L2
Neutral
Ground
ATS
Relay
Breaker
Breaker
Existing
PV Panel
Existing
PV Inverter
EMS Box
Generator
MeterMain Panel
Backup
Load
Power Grid
Internal Circuit
Power
Bus
Signal
Bus
Legend
EN
ALWAYS SHARE EXCELLENCE
34
background
Fig. 7-20 Partial backup
Busbar
Heavy Loads
Air
Conditioner
Pool Pump
EV Charger
BLUETTI
ESS
BLUETTI
ESS
AT1 Smart Distribution Panel
L1
L2
Neutral
Ground
ATS
Relay
Breaker
Breaker
Existing
PV Panel
Existing
PV Inverter
EMS Box
Generator
Main Panel
Non-Critical
Load
Sub Panel
Critical
Load
Meter
Power Grid
Internal Circuit
Power
Bus
Signal
Bus
Legend
ALWAYS SHARE EXCELLENCE 35
EN
background
7.7.2 System without Backup Breaker
Fig. 7-21 Whole-home backup
Busbar
BLUETTI
ESS
BLUETTI
ESS
AT1 Smart Distribution Panel
Air
Conditioner
Pool Pump
EV Charger
Heavy Loads
Existing
PV Panel
Existing
PV Inverter
EMS Box
Generator
Meter with
Breaker
Main Panel
Backup
Load
Power Grid
Internal Circuit
L1
L2
Neutral
Ground
ATS
Relay
Screw
Terminal
Breaker
Power
Bus
Signal
Bus
Legend
EN
ALWAYS SHARE EXCELLENCE
36
background
Fig. 7-22 Partial backup
Busbar
Heavy Loads
Air
Conditioner
Pool Pump
EV Charger
BLUETTI
ESS
BLUETTI
ESS
AT1 Smart Distribution Panel
Existing
PV Panel
Existing
PV Inverter
EMS Box
Generator
Main Panel
Non-Critical
Load
Sub Panel
Critical
Load
Meter
Power Grid
Internal Circuit
L1
L2
Neutral
Ground
ATS
Relay
Screw
Terminal
Breaker
Power
Bus
Signal
Bus
Legend
ALWAYS SHARE EXCELLENCE 37
EN
background
7.7.3 Connecting to Energy Storage System
7.7.3.1 EnergyPro 13K
Fig. 7-23 1* EnergyPro 13K
Main Panel
Backup
Load
Existing
PV Panel
Existing
PV Inverter
Generator
EnergyPack 500
EnergyPack 500
EnergyPack 500
EnergyPack 500
EnergyPro 13K
EnergyPro 13K
Heavy Loads
Air
Pool Pump
EV Charger
AT1 Smart Distribution Panel
Grid
Busbar
EMS Box
Meter
Internal Circuit
LINK
PORT1
LINK
PORT2
GRID
L2
N
L1
G
BACKUP
L2
N
L1
G
1
8
1
1
1
3
6
3
ESS 1
L1
L2
Neutral
Ground
ATS
Relay
Breaker
Breaker
Power
Bus
Signal
Bus
Legend
RJ45
Port
EN
ALWAYS SHARE EXCELLENCE
38
background
L1
L2
Neutral
Ground
ATS
Relay
Breaker
Breaker
Busbar
Power
Bus
Signal
Bus
Legend
RJ45
Port
Existing
PV Panel
Existing
PV Inverter
EMS Box
Generator
MeterMain Panel
Backup
Load
Grid
Internal Circuit
EnergyPack 500
EnergyPack 500
EnergyPack 500
EnergyPack 500
EnergyPro 13K
LINK
PORT1
LINK
PORT2
GRID
L2
N
L1
G
BACKUP
L2
N
L1
G
EnergyPack 500
EnergyPack 500
EnergyPack 500
EnergyPack 500
EnergyPro 13K
LINK
PORT1
LINK
PORT2
GRID
L2
N
L1
G
BACKUP
L2
N
L1
G
1
8
1
1
1
3
6
3
ESS 1
ESS 2
Heavy Loads
Air
Conditioner
Pool Pump
EV Charger
AT1 Smart Distribution Panel
Fig. 7-24 2* EnergyPro 13K
ALWAYS SHARE EXCELLENCE 39
EN
background
Note: Do not connect loads to the BACKUP block on the EnergyPro 13K.
Fig. 7-25 3* EnergyPro 13K
Existing
PV Panel
Existing
PV Inverter
EMS Box
Generator
MeterMain Panel
Backup
Load
Internal Circuit
EnergyPro 13K
LINK
PORT1
LINK
PORT2
GRID
L2
N
L1
G
BACKUP
L2
N
L1
G
EnergyPro 13K
LINK
PORT1
LINK
PORT2
GRID
L2
N
L1
G
BACKUP
L2
N
L1
G
EnergyPro 13K
LINK
PORT1
LINK
PORT2
GRID
L2
N
L1
G
BACKUP
L2
N
L1
G
1
8
1
1
1
3
6
3
ESS 1
ESS 2
ESS 3
L1
L2
Neutral
Ground
ATS
Relay
Breaker
Breaker
Power
Bus
Signal
Bus
Legend
RJ45
Port
EnergyPack 500
EnergyPack 500
EnergyPack 500
EnergyPack 500
EnergyPack 500
EnergyPack 500
EnergyPack 500
EnergyPack 500
EnergyPack 500
EnergyPack 500
EnergyPack 500
EnergyPack 500
AT1 Smart Distribution Panel
Busbar
Grid
EN
ALWAYS SHARE EXCELLENCE
40
background
7.7.3.2 EnergyPro 6K
Fig. 7-26 1* EnergyPro 6K
Heavy Loads
Air
Conditioner
Pool Pump
EV Charger
AT1 Smart Distribution Panel
Grid
Busbar
Existing
PV Panel
Existing
PV Inverter
EMS Box
Generator
MeterMain Panel
Backup
Load
Internal Circuit
1
8
1
1
1
3
6
3
ESS 1
L1
L2
Neutral
Ground
ATS
Relay
Breaker
Breaker
Power
Bus
Signal
Bus
Legend
RJ45
Port
EnergyPro 6K
LINK
PORT1
LINK
PORT2
AC
PORT
L2
N
L1
G
ALWAYS SHARE EXCELLENCE 41
EN
background
Existing
PV Panel
Existing
PV Inverter
EMS Box
Generator
MeterMain Panel
Backup
Load
Internal Circuit
1
8
1
1
1
3
6
3
ESS 1
ESS 2
L1
L2
Neutral
Ground
ATS
Relay
Breaker
Breaker
Power
Bus
Signal
Bus
Legend
RJ45
Port
EnergyPro 6K
LINK
PORT1
LINK
PORT2
AC
PORT
L2
N
L1
G
EnergyPro 6K
LINK
PORT1
LINK
PORT2
AC
PORT
L2
N
L1
G
Heavy Loads
Air
Conditioner
Pool Pump
EV Charger
AT1 Smart Distribution Panel
Grid
Busbar
Fig. 7-27 2* EnergyPro 6K
EN
ALWAYS SHARE EXCELLENCE
42
background
Fig. 7-28 3* EnergyPro 6K
Existing
PV Panel
Existing
PV Inverter
EMS Box
Generator
MeterMain Panel
Backup
Load
Internal Circuit
1
8
1
1
1
3
6
3
ESS 1
ESS 2
L1
L2
Neutral
Ground
ATS
Relay
Breaker
Breaker
Power
Bus
Signal
Bus
Legend
RJ45
Port
EnergyPro 6K
LINK
PORT1
LINK
PORT2
AC
PORT
L2
N
L1
G
EnergyPro 6K
LINK
PORT1
LINK
PORT2
AC
PORT
L2
N
L1
G
ESS 3
EnergyPro 6K
LINK
PORT1
LINK
PORT2
AC
PORT
L2
N
L1
G
AC Combiner Box
60A
PORT
L2
N
L1
G
30A
PORT
L2
N
L1
G
30A
PORT
L2
N
L1
G
Heavy Loads
Air
Conditioner
Pool Pump
EV Charger
AT1 Smart Distribution Panel
Grid
Busbar
ALWAYS SHARE EXCELLENCE 43
EN
background
Fig. 7-29 4* EnergyPro 6K
Existing
PV Panel
Existing
PV Inverter
EMS Box
Generator
MeterMain Panel
Backup
Load
Internal Circuit
1
8
1
1
1
3
6
3
ESS 4
L1
L2
Neutral
Ground
ATS
Relay
Breaker
Breaker
Power
Bus
Signal
Bus
Legend
RJ45
Port
EnergyPro 6K
LINK
PORT1
LINK
PORT2
AC
PORT
L2
N
L1
G
ESS 2
EnergyPro 6K
LINK
PORT1
LINK
PORT2
AC
PORT
L2
N
L1
G
EnergyPro 6K
LINK
PORT1
LINK
PORT2
AC
PORT
L2
N
L1
G
ESS 3
EnergyPro 6K
LINK
PORT1
LINK
PORT2
AC
PORT
L2
N
L1
G
90A
PORT
L2
N
L1
G
30A
PORT
L2
N
L1
G
30A
PORT
L2
N
L1
G
30A
PORT
L2
N
L1
G
ESS 1
Heavy Loads
Air
Conditioner
Pool Pump
EV Charger
AT1 Smart Distribution Panel
AC Combiner Box
Grid
Busbar
EN
ALWAYS SHARE EXCELLENCE
44
background
Fig. 7-30 5* EnergyPro 6K
Existing
PV Panel
Existing
PV Inverter
EMS Box
Generator
MeterMain Panel
Backup
Load
Internal Circuit
1
8
1
1
1
3
6
3
ESS 1
ESS 2
L1
L2
Neutral
Ground
ATS
Relay
Breaker
Breaker
Power
Bus
Signal
Bus
Legend
RJ45
Port
EnergyPro 6K
LINK
PORT1
LINK
PORT2
AC
PORT
L2
N
L1
G
EnergyPro 6K
LINK
PORT1
LINK
PORT2
AC
PORT
L2
N
L1
G
60A
PORT
L2
N
L1
G
30A
PORT
L2
N
L1
G
30A
PORT
L2
N
L1
G
ESS 3
ESS 4
EnergyPro 6K
LINK
PORT1
LINK
PORT2
AC
PORT
L2
N
L1
G
EnergyPro 6K
LINK
PORT1
LINK
PORT2
AC
PORT
L2
N
L1
G
ESS 5
EnergyPro 6K
LINK
PORT1
LINK
PORT2
AC
PORT
L2
N
L1
G
90A
PORT
L2
N
L1
G
30A
PORT
L2
N
L1
G
30A
PORT
L2
N
L1
G
30A
PORT
L2
N
L1
G
AT1 Smart Distribution Panel
Heavy Loads
Air
Conditioner
Pool Pump
EV Charger
AC Combiner Box
AC Combiner Box
Grid
Busbar
ALWAYS SHARE EXCELLENCE 45
EN
background
7.7.3.3 Apex 300
Fig. 7-31 1* Apex 300
EN
ALWAYS SHARE EXCELLENCE
46
Busbar
Hub A1
Battery Pack
Heavy Loads
Air
Conditioner
Pool Pump
EV Charger
AT1 Smart Distribution Panel
Existing
PV Panel
Existing
PV Inverter
Generator
Internal Circuit
1
8
1
1
1
3
6
3
L1
L2
Neutral
Ground
ATS
Relay
Breaker
Breaker
Power
Bus
Signal
Bus
Legend
RJ45
Port
P050A
AC
Port
L2
N
L1
G
Comm
P050A
AC
Port
L2
N
L1
G
Comm
P050A
AC
Port
L2
N
L1
G
Comm
RJ45
Port
AC
In / Out
Port
L2
N
L1
G
ESS 1
Apex 300
20A AC
Outlet
L2
N
L1
30A AC
Outlet
L2
N
L1
50A AC
Outlet
L2
N
L1
G
50A AC
In / Out
L2
N
L1
G
Comm
Load
Load
Load
Sub Panel
Critical
Load
Main Panel
Non-Critical
Load
Meter
Power Grid
background
Fig. 7-32 2* Apex 300
Busbar
Hub A1
Heavy Loads
Air
Conditioner
Pool Pump
EV Charger
Battery Pack
Battery Pack
AT1 Smart Distribution Panel
Existing
PV Panel
Existing
PV Inverter
Generator
Internal Circuit
1
8
1
1
1
3
6
3
L1
L2
Neutral
Ground
ATS
Relay
Breaker
Breaker
Power
Bus
Signal
Bus
Legend
RJ45
Port
P050A
AC
Port
L2
N
L1
G
Comm
P050A
AC
Port
L2
N
L1
G
Comm
P050A
AC
Port
L2
N
L1
G
Comm
RJ45
Port
AC
In / Out
Port
L2
N
L1
G
ESS 1
Apex 300
20A AC
Outlet
L2
N
L1
30A AC
Outlet
L2
N
L1
50A AC
Outlet
L2
N
L1
G
50A AC
In / Out
L2
N
L1
G
Comm
Load
Load
Load
ESS 2
Apex 300
20A AC
Outlet
L2
N
L1
30A AC
Outlet
L2
N
L1
50A AC
Outlet
L2
N
L1
G
50A AC
In / Out
L2
N
L1
G
Comm
Load
Load
Load
Main Panel
Non-Critical
Load
Meter
Power Grid
Sub Panel
Critical
Load
ALWAYS SHARE EXCELLENCE 47
EN
background
Note: Use the dedicated P050A parallel cable to connect Hub A1 and Apex 300.
Fig. 7-33 3* Apex 300
Hub A1
Heavy Loads
Air
Conditioner
Pool Pump
EV Charger
Apex 300
20A AC
Outlet
L2
N
L1
30A AC
Outlet
L2
N
L1
50A AC
Outlet
L2
N
L1
G
50A AC
In / Out
L
N
L
G
Comm
Load
Load
Load
Battery Pack
Apex 300
20A AC
Outlet
L2
N
L1
30A AC
Outlet
L2
N
L1
50A AC
Outlet
L2
N
L1
G
50A AC
In / Out
L
N
L
G
Comm
Load
Load
Load
Battery Pack
Apex 300
20A AC
Outlet
L2
N
L1
30A AC
Outlet
L2
N
L1
50A AC
Outlet
L2
N
L1
G
50A AC
In / Out
L
N
L
G
Comm
Load
Load
Load
Battery Pack
AT1 Smart Distribution Panel
Busbar
Existing
PV Panel
Existing
PV Inverter
Generator
Internal Circuit
1
8
1
1
1
3
6
3
L1
L2
Neutral
Ground
ATS
Relay
Breaker
Breaker
Power
Bus
Signal
Bus
Legend
RJ45
Port
P050A
AC
Port
L2
N
L1
G
Comm
P050A
AC
Port
L2
N
L1
G
Comm
P050A
AC
Port
L2
N
L1
G
Comm
RJ45
Port
AC
In / Out
Port
L2
N
L1
G
ESS 1
ESS 2
ESS 3
Main Panel
Non-Critical
Load
Meter
Power Grid
Sub Panel
Critical
Load
EN
ALWAYS SHARE EXCELLENCE
48
background
Fig. 7-34
7.8 Other Components
7.8.1 Rapid Shutdown Switch
The AT1 can connect to a Rapid Shutdown (RSD) switch via the RSD+ / RSD- ports. For
details, see Chapter 6.4.3.
• When the RSD switch is OFF, AT1 will automatically shut down all output.
• When switched back to ON, AT1 runs a self-test and then resumes normal operation.
Install the Rapid Shutdown Switch
Step 1: Remove the factory jumper from the RSD+/RSD- ports on the signal panel.
Step 2: Use at least 24 AWG conductors and connect the RSD ports to a compatible RSD
switch.
Switch Requirements
- Listed or recognized as an Emergency Stop (button, device, or unit)
- Certified to UL 508 or UL 60947-1 / -5-1 / -5-5
- Rated for 12V or higher
- Outdoor-rated (NEMA 3R or higher)
- Terminals must support 24 AWG wire or larger
Installation Guidelines
• Mount the switch outdoors, in a visible and accessible location—ideally near the grid meter.
• Keep the low-voltage wire run under 150 ft (45 m).
• Install the control circuit using Type TC-ER cable or within an appropriate raceway.
Grid
Backup
Comm
Error
1
8
1
1
1
3
6
3
NO NO
Connect to Pin
5 and Pin 6 on
the digital
signal terminal.
ALWAYS SHARE EXCELLENCE 49
EN
background
Fig. 7-35
Fig. 7-36
Step 1: Install the SIM card into the SIM slot on the signal panel, as shown in Chapter 6.4.
Step 2: Slide the 4G module into its slot at a slight angle. Once it's in, press it down
gently—it should sit flat and line up with the screw holes.
Step 3: Secure the module using the two included screws.
Step 4: Attach the antenna to the green-marked port on the module, as shown below.
Step 5: Mount the external antenna and tighten it securely to keep out moisture.
Step 6: Connect the external antenna to the other end of the 4G module's antenna cable.
Step 7: Use zip ties to neatly secure the antenna in place.
Step 8: Reinstall the front panel and power on the AT1.
7.8.2 4G Module & External Antenna
Attention: Power off the AT1 following the steps in Chapter 8.4, then remove the front panel.
Step 3: Connect antenna to
the designated terminal.
Step 2: Insert the 4G module into the
card slot and secure it with 2 screws.
Step 1: Insert SIM card
into the card slot.
EN
ALWAYS SHARE EXCELLENCE
50
background
8. System Commissioning
8.1 Preliminary Check
Before powering up the AT1 for the first time, double check:
• All system components are installed properly.
• Verify that the L (live) and N (neutral) wires are securely connected, with correct
polarity, and that the voltage is within the acceptable range.
• Make sure the ground wire is properly and securely connected.
• All AC circuit breakers are switched OFF.
• AC circuit breakers used meet manual requirements and local regulations.
• Grid and load cables are securely and correctly wired.
• Safety signs and warning labels are firmly attached and clearly visible.
8.2 Power on
Step 1: For the initial use, ensure the circuit breakers of the grid, backup load, ESS, smart
backup load, generator, and AC PV are powered off.
Step 2: Turn the AT1 system switch to ON.
Step 3: Switch the Grid breaker to ON.
Step 4: The “Grid” indicator lights on, indicating the AT1 is powered by the grid.
Step 5: Wait for a while. If the “Error” indicator stays off, the system is ready.
Step 6: Open the app and connect to AT1. If the “Comm” indicator flashes quickly with
pauses, the app is connected successfully. If it stays steady, the AT1 is connected to the
app cloud.
Step 7: Switch ON all breakers: backup load, ESS, smart backup load, generator, and AC PV.
8.3 Firmware Upgrade
The AT1 can be upgraded via Bluetooth or OTA. For details, please refer to “Firmware
Upgrade” in the BLUETTI App User Manual.
8.4 Power off
Step 1: If installed, press the Rapid Shutdown Switch.
Step 2: Switch the ESS breaker(s) to OFF.
Warning
After powering off the AT1, residual voltage may still be present, which
can cause electric shock or burns. Please wait at least 5 minutes and
wear protective gloves before handling the panel.
ALWAYS SHARE EXCELLENCE 51
EN
background
9. Specifications
AC Output
Nominal Voltage
Grid Frequency
120 V/240 V
60 Hz
Max. Continuous Current
AC PV
Generator
Smart Load (connected to ESS 3)
ESS 1
ESS 2
Backup Port
Grid Port
Busbar
64 A (80 A Max. OCPD)
64 A (80 A Max. OCPD)
64 A (80 A Max. OCPD)
80 A (100 A Max. OCPD)
80 A (100 A Max. OCPD)
160 A (200 A Max. OCPD)
160 A (200 A Max. OCPD)
160 A (200 A Max. OCPD)
Item Rating
Max. Input Short-Circuit Current
Generator Connection
Generator Startup
Smart Load Control
Overvoltage Category
Communication
Indicators
User Interface
Rapid Shutdown Switch
Warranty
10 kA
Normally open dry contact
Automatic
Automatic/Manual
Category III
Bluetooth/WiFi/Ethernet/RS485/4G (Optional)
LED
App
Supported
10 years
Step 3: Switch the Grid breaker to OFF.
Step 4: Switch the AC PV (Solar) breaker to OFF.
Step 5: Switch the Generator breaker to OFF.
Step 6: Switch the Smart Load breaker to OFF.
Step 7: Switch the Backup breaker to OFF.
Step 8: Turn off the system switch and wait for all indicators to turn off.
Step 9: Press the ESS power button to shut down the system.
EN
ALWAYS SHARE EXCELLENCE
52
background
General
Dimensions (H × W × D)
Net Weight
Mounting
Protection Rating
Operating Temperature
Storage Temperature
Operating Humidity
Operating Altitude
35.8 × 23.6 × 6.44 in (910 × 600 × 163.6 mm)
About 56.44 lbs (25.6 kg)
Wall-mounted
NEMA 3R
-4°F to 122°F (-20°C to 50°C)
-4°F to 158°F (-20°C to 70°C)
Up to 95% relative humidity
≤ 6,561.68 ft (2,000 m)
Compliance
Certifications
Emissions
UL1741, UL67, UL869A, UL916
FCC Part 15, ICES-003
10. Troubleshooting
When a fault occurs, the “Error” indicator will flash and details will appear in the app. Please
contact BLUETTI support for assistance.
Relay open
Relay short circuit
Internal communication error - sampling module
Input overfrequency/underfrequency protection
Input overvoltage/undervoltage protection
Input overcurrent/undercurrent protection
Internal communication error - IoT module
Inverter warning/fault
Flashes rapidly.
Flashes slowly.
Error Description Indicator Status
FAQs (Frequently Asked Questions)
Q1:
A:
Q2:
A:
Tips for maintaining the AT1:
To keep the AT1 in good condition:
a. Keep it clean and dry.
b. Ensure proper ventilation.
Does AT1 have safety features?
Absolutely. AT1 comes with protections for overcurrent, short circuit, overvoltage, and
undervoltage.
ALWAYS SHARE EXCELLENCE 53
EN
background
Appendix
Update Firmware via BLUETTI App
Keeping firmware updated is IMPORTANT for optimal performance. For detailed instructions,
refer to the app user manual in the app. This manual uses the Elite 200 V2 upgrade as an
example.
1. Download the BLUETTI app
Scan the QR code or search for “BLUETTI” in the App
Store or Google Play to download the app.
2. Log in or sign up
Log in with a BLUETTI account. If there is no
account, create one by following the on-screen
instructions.
3. Bind the unit
• Tap Add Device directly or
access My Devices > Add
Device to start the process.
• Select the unit from the
available device list, or choose
Add Manually and enter the
unit's serial number (SN).
• Alternatively, tap Scan on the
Home page or in Add Device
page to bind via QR code.
EN
ALWAYS SHARE EXCELLENCE
54
background
4. Connect via Bluetooth
On the My Devices page, tap the unit and
select Bluetooth as the connection method.
Notes:
• Ensure the unit remains powered on and connected during the update.
• Keep your phone and the unit close together (recommended range: 16.4ft / 5m).
• Do not exit app until done.
5. Check for Firmware Updates
Tap Upgrade to access the Upgrade page.
The app will check for the latest firmware version
available for the unit.
6. Download and Install the Update
If a new firmware update is available, tap
Upgrade and follow the on-screen instructions.
ALWAYS SHARE EXCELLENCE 55
EN
background
• FCC Statement
This device complies with part 15 of the FCC Rules. Operation is subject to the following
two conditions:
(1) This device may not cause harmful interference.
(2) This device must accept any interference received, including interference that may
cause undesired operation.
This equipment has been tested and found to comply with the limits for a Class B digital
device, pursuant to part 15 of the FCC Rules. These limits are designed to provide
reasonable protection against harmful interference in a residential installation. This
equipment generates, uses and can radiate radio frequency energy and, if not installed
and used in accordance with the instructions, may cause harmful interference to radio
communications. However, there is no guarantee that interference will not occur in a
particular installation. If this equipment does cause harmful interference to radio or television
reception, which can be determined by turning the equipment off and on, the user is
encouraged to try to correct the interference by one or more of the following measures:
- Reorient or relocate the receiving antenna.
- Increase the separation between the equipment and receiver.
- Connect the equipment into an outlet on a circuit different from that to which the
receiver is connected.
- Consult the dealer or an experienced radio / TV technician for help.
FCC Caution: Any changes or modifications not expressly approved by the party
responsible for compliance could void the user's authority to operate this equipment.
IMPORTANT NOTE: FCC Radiation Exposure Statement
This equipment complies with FCC radiation exposure limits set forth for an uncontrolled
environment. This equipment should be installed and operated with a minimum
distance of 20cm between the radiator and your body.
Compliance
• IC Caution
This device contains licence-exempt transmitter(s) / receiver(s) that comply with
Innovation, Science and Economic Development Canada’s licence-exempt RSS(s).
Operation is subject to the following two conditions:
(1) This device may not cause interference.
(2) This device must accept any interference, including interference that may cause
undesired operation of the device.
EN
ALWAYS SHARE EXCELLENCE
56
background
RF exposure statement: The equipment complies with ISED Radiation exposure limits
set forth for uncontrolled environments. This equipment should be installed and
operated with a minimum distance of 20cm between the radiator and your body.
L’émetteur/récepteur exempt de licence contenu dans le présent appareil est conforme
aux CNR d’Innovation, Sciences et Développement économique Canada applicables
aux appareils radio exempts de licence. L’exploitation est autorisée aux deux conditions
suivantes:
(1) L' appareil ne doit pas produire de brouillage;
(2) L' appareil doit accepter tout brouillage radioélectrique subi, même si le brouillage
est susceptible d' en compromettre le fonctionnement.
Déclaration d'exposition aux RF : L'équipement est conforme aux limites d'exposition
aux rayonnements ISED définies pour les environnements non contrôlés. Cet équipement
doit être installé et utilisé avec une distance minimale de 20 cm entre le radiateur et
votre corps.
CAN ICES (B) / NMB (B)
Lignes directrices importantes
Pour une performance et une sécurité optimales, veuillez suivre les lignes directrices
suivantes :
• Utilisez et stockez toujours le produit dans les conditions spécifiées dans ce manuel.
• Veiller à ce que le produit soit utilisé conformément à toutes les normes et réglementations
pertinentes.
• éviter les modifications non autorisées, le désassemblage ou les changements de logiciel.
Lisez toutes les instructions et tous les avertissements relatifs à ce produit.
BLUETTI n'est pas responsable des situations suivantes ni des conséquences qui en
découlent :
• Les dommages causés par des catastrophes naturelles, y compris les tremblements de
terre, les incendies, les inondations, les tempêtes ou les coulées de boue.
•
Informations sur la sécurité
Avant d'utiliser ce produit, veuillez lire attentivement le manuel et suivre toutes les
consignes de sécurité. Prêtez attention aux dangers, avertissements, attentions, remarques
et autres étiquettes de sécurité figurant dans le manuel et sur le produit lui-même. Si vous
avez des questions ou si vous rencontrez une situation qui n'est pas abordée dans ce
manuel, veuillez nous contacter. Une utilisation incorrecte ou non autorisée peut entra?ner
des dommages ou des blessures qui ne sont pas couverts par la garantie.
ALWAYS SHARE EXCELLENCE 57
EN
background
• Ne pas nettoyer le produit avec de l'eau.
• Tenir le produit à l'écart des sources de chaleur ou des environnements à haute
température.
• N'utilisez jamais le produit à proximité de flammes nues, de gaz explosifs ou dans des
environnements contenant de la fumée, des vapeurs ou d'autres conditions dangereuses.
• Ne pas utiliser le produit lorsqu'il est humide. S'assurer que le produit est complète-
ment sec avant de l'utiliser.
• N'ouvrez pas ou ne modifiez pas le produit vous-même. Seul un personnel qualifié doit
effectuer des réparations ou remplacer des pièces en utilisant des composants et des
cables approuvés par BLUETTI afin d'éviter tout risque d'incendie, d'électrocution ou
d'autres blessures.
Directives d'utilisation
• Veillez à faire correspondre les bornes positives et négatives.
• Assurez-vous que toutes les vis sont bien serrées.
• Assurez-vous que le produit est bien installé avant de l'utiliser.
CONSERVER CES INSTRUCTIONS
• Les dommages survenus au cours d'un transport effectué par le client.
• Problèmes causés par un stockage ou une utilisation inappropriés en dehors des
conditions spécifiées dans le présent manuel.
• Les dommages causés par la négligence du client, une mauvaise utilisation ou un
préjudice intentionnel.
• Les dommages causés par des actions de tiers, y compris une manipulation, une
utilisation ou une installation non conforme à ce manuel.
• Dommages ou problèmes causés par des réparations ou des ajustements non
autorisés, ou par le retrait des étiquettes du produit.
• Dommages ou risques de sécurité causés par l'utilisation d'appareils non approuvés par
BLUETTI pour alimenter ce produit.
• Accidents ou problèmes de sécurité résultant de l'utilisation du produit dans des
applications critiques, telles que le nucléaire, l'aviation ou les domaines médicaux, où une
grande fiabilité est essentielle pour la sécurité des personnes ou le fonctionnement.
Danger
Pour assurer un fonctionnement sûr, veuillez suivre les instructions
ci-dessous.
Instructions relatives aux risques d'incendie, d'électrocution ou de blessure des personnes
EN
ALWAYS SHARE EXCELLENCE
58
background
@ BLUETTI Official
@bluetti.inc @bluetti.inc
Need Help? We're here for you!
Visit Us
BLUETTI Power Inc.
6185 S Valley View Blvd, Ste D, Las Vegas, NV 89118, US
+1 909-570-0909
Mon–Sat, 06:00–17:00 (PDT)
service@bluettipower.com
@ bluetti_inc
background
Certificate
Inspector:
QC:
P/N: 17.0303.0944-01A1
Always Share Excellence

Specifications

Indexed Terms: Connection Cable, Cable

BLUETTI DB Questions and Answers

Questions and Answers

Related Products