Loading ...
Loading ...
Loading ...
7
1. Connectthedrainsocket(suppliedwiththeunit)tothedrainport.(Fig.6-2)
(AfxthetubeusingPVCadhesivethensecureitwithaband.)
2. Installalocallypurchaseddrainpipe(PVCpipe,O.D.ø32mm(1-1/4inch)).
(AfxthepipeusingPVCadhesivethensecureitwithaband.)
3. Insulatethetubeandpipe.(PVCpipe,O.D.ø32mm(1-1/4inch)andsocket)
4. Checkthatdrainowssmoothly.
5. Insulate thedrain portwith insulatingmaterial, thensecure thematerial witha
band.(Bothinsulatingmaterialandbandaresuppliedwiththeunit.)
A Mainunit
B Insulating material
C Band(large)
D Drainport(transparent)
E Insertion margin
F Matching
G Drainpipe(O.D.ø32mm(1-1/4inch)
PVCTUBE)
H Insulatingmaterial(purchasedlocally)
I TransparentPVCpipe
J O.D.ø32mm(1-1/4inch)PVCTUBE(Slope
1/100ormore)
K Band(middle)
L Drain socket
(inch)
Fig.6-2
6. Drainagepipingwork
Fig.6-1
6.1. Drainagepipingwork(Fig.6-1)
• UseVP25(O.D.ø32mm(1-1/4inch)PVCTUBE)fordrainpipingandprovide
1/100ormoredownwardslope.
• Besuretoconnectthepipingjointsusingapolyvinyltypeadhesive.
• Observethegureforpipingwork.
• Usetheincludeddrainhosetochangetheextractiondirection.
1 Correct piping
2 Wrongpiping
A Insulation(9mm(11/32inch)ormore)
B Downwardslope(1/100ormore)
C Support metal
K Airbleeder
L Raised
M Odor trap
Grouped piping
D O.D.ø32mm(1-1/4inch)PVCTUBE
E Makeitaslargeaspossible
F Indoor unit
G Makethepipingsizelargeforgroupedpiping.
H Downwardslope(1/100ormore)
I O.D.ø38mm(1-1/2inch)PVCTUBEforgroupedpiping
(9mm(11/32inch)ormoreinsulation)
J Upto850(33inch)
1
2
A
B
C
B
M
L
K
D
E
D
H
I
G
D
F
F
F
J
F
B
C
F
K
D E E
L
G
H
I
AA
J
C,K
1-3/16 1-3/161-3/16
Max.65ft
5 to 7 ft
Max.6in
Loading ...
Loading ...
Loading ...