Fotile JQG7502G v Series 30 Inch Under Cabinet Ducted Hood with 510 CFM, Halogen Lights, Dual-Centrifuge Fan System in Silver Grey

User Manual - Page 8

For JQG7502G.

PDF File Manual, 22 pages, Download pdf file

Loading ...
Loading ...
Loading ...
- 32 - - 33 -
If there is a big gap between the bottom board
of the top cabinet and the top of the range hood,
please add wood pads based on the gap size near
the three M5×70 screws to avoid range hood shell
deformation caused by the tightening of screws,
which will affect the use of the range hood.
Range hood shel
Wooden plate
the bottom
board of the
top cabinet
Caution: Two installers are required to ensure
safe installation.
9. Place the gasket seal on the hood outlet and x
the duct cover with four screws of outlet housing.
Then, secure the duct to the duct cover and seal
the connection with aluminum tape.
10. Install the smoke bafe plate.
Remove the "Installation Tips" on the smoke
bafe plate;
Take out one screw in the accessory bag
(keep another screw for backup);
Open the Smoke Baffle Plate to the
maximum angle;
Fix the left bracket with the screwdriver and
screw;
Install Collision Avoidance Elements on both
left and right corners of the Smoke Bafe Plate.
Installation Instructions for the Decorative
Plate with Upper Cabinet :
Caution: Please confirm the height of the top
cabinet. If the upper cabinet is over 32 1/2"
es (825mm) high, 6" or 12" decorative plate is
preferred.
Diameter of smoke
tube
Φ6" (152.5mm)
Diameter of hole digging
Φ
6 1/2" (165mm)
6"(152.4mm)
or
12"(304.8mm)
7 11/16"
(194.4mm)
or
13 11/16"
(346.8mm)
1.Unpack the appliance and check the List of
Accessories.
2. Locate the wooden beam and mark the
location with a pencil. Mark another beam 16"
or 24" to either side of this mark.
Framing Stud
3. Locate the duct bracket. Determine the
central point and mark the centerline on the wall
where the hood will be installed. Also, mark the
point where the central line and the top cabinet
meet. This is the location, in which to secure the
bracket. Mark screw hole locations on the wall.
The upper edge (the fixed surface between
the decorative sheet and the board of the top
cabinet) of the bottom board of the top cabinet
shall be deemed as the location datum. And
the distance between the upper edge and the
center of the bracket shall be 7 11/16"/194.4mm
for 6" decorative sheet and 13 11/16"/ 346.8mm
for 12" decorative sheet.
The upper edge (the fixed
surface between the decorative
sheet and the board of the top
cabinet) of the bottom board of
the top cabinet shall be deemed
as the location datum.
4.Fasten the bracket: drill Ø8 hole at the screw
hole marks with electric drill, embed expansion
tubes and fasten the bracket with bracket
screws. Use leveling instrument to make sure
that the bracket is leveled.
Caution: One of the brackets for main engine
must be fastened to the beam.Screws must
be fixed at Hole A and B in the drawing; also
screws must be fixed at bracket bores with
corresponding wooden stakes in Area C.
5. Attach the paper template onto the bottom of
the cabinet to determine and drill the duct cover
hole, screw holes, and wire hole.
Caution: Wear safety goggles when drilling.
In case of batten at the wall facing the bottom
plate, the rear wall side of the paper template
shall be cut as per the thickness of the batten.
11. Make sure the hood is leveled. Install the
Grease Cup, and plug in the appliance for a test
run.
Warning: Please wear the qualified protective
gloves in operation.
Loading ...
Loading ...
Loading ...