GE - General Electric AZ85H12EACW1 Official GE Zoneline Air Conditioner

User Manual - Page 21

For AZ85H12EACW1.

PDF File Manual, 28 pages, Download pdf file

Loading ...
Loading ...
Loading ...
Installation Instructions
J_ MAKE UNIT ELECTRICAL
CONNECTIONS
1.Connect the thermostat wires to the unit and set
the dip switchesto the appropriate settings.
NOTE:Seethe Controls-Terminal Connections
and Controls-Dip Switches sections
of this manual and the manual with
the separate thermostat for proper
connections and settings.
Unit Connections
Maximum Wiring
Length for Thermostat
Connection to the Unit
66 ft. for AWG 18
60 ft. for AWG 20
40 ft. for AWG 24
AWG - American Wire Gauge
2. Hake power connections to the unit.
NOTE: See the ELECTRICALREQUIREMENTSand
DIRECTCONNECTAPPLICATIONSsections,
as appropriate, of this manual for proper
connections.
3. Replace the case front panel by replacing the four
front screws and the two top screws.
-7] CONNECT THE TOP DUCT
!. Install the duct onto the air discharge outlet.
Inside
wall
Air/
discharge
outlet
2. Securethe top duct to the unit byturning the four
case top duct adjusting screws until they are tight.
Use a field suppliedclamp to lock the top duct
to the case.
Top duct
Clamp
Case top
duct adjusting
screws
21
Loading ...
Loading ...
Loading ...