Avid 9935-65974-00 VENUE E6L-144 Engine with 3-Year Advantage Elite Live Support Plan

User Manual - Page 74

For 9935-65974-00.

PDF File Manual, 432 pages, Read Online | Download pdf file

9935-65974-00 photo
Loading ...
Loading ...
Loading ...
Configuring System Audio 62
Powering the System Up and Down
Use the following instructions to power the system up and down for regular, day-to-day start up and shut down after the system(s)
have been connected and configured as explained in the VENUE |S6L Installation Guide.
Make sure you have installed the most recent VENUE software.
Power up the system in the following sequence:
1 If more than one system is connected for I/O Sharing, do the following steps for the Clock Master system first.
2 If applicable, power on routers for use with ECx remote control.
3 Power on any connected computers for recording/playback.
4 Power on the connected video monitor.
5 Power on the E6L engine by pressing the power switch(es) on the back to the on (1) position. On the front panel of the E6L en-
gine, the front-panel LEDs light as follows:
Status LED lights green.
The System LED begins to flash amber while the E6L is waiting to connect to the S6L control surface, then turns green when
connection is complete.
6 Power on the S6L control surface by pressing the power switch on the back panel
to the on (1) position.
The LEDs on each of the S6Ls PSUs light green, and Avid logos appear on the
Master Touch Screen (MTS), the Channel touch Modules (CTMs) (if present),
and the external screen while the system initializes.
If you are powering up the system for the first time, or the S6L control surface is
connected to a different E6L engine than it was previously connected to, the
Please Select Engine screen appears on the MTS when initialization is complete.
.
If the Please Select Engine dialog appears, complete the rest of these power up instructions and then proceed to
Confirming Sys-
tem Components.
If you have not installed the most recent VENUE software, or if on initial power-up S6L prompts you to update your system,
go to the Avid account linked to your S6L purchase to download the latest software and plug-in installers. Instructions for in-
stalling VENUE software are provided in the VENUE | S6L Installation Guide, available as a PDF in your Avid account.
Make sure no VGA monitor, mouse, keyboard, or internet is connected to the E6L engine before powering up your S6L system.
Please Select Engine Screen on the MTS
If the E6L engine has not fully initialized by the time the S6L control surface has initialized, “Waiting for the E6L Engine to
start...” appears in the MTS until the E6L finishes initializing.
Avid logo on-screen
Loading ...
Loading ...
Loading ...