Traulsen RL232N-COR01 52.13'' 46.0 cu. ft. Top Mounted 2 Section Solid Door Reach-In Freezer

Owner s manual - Page 3

For RL232N-COR01.

PDF File Manual, 18 pages, Read Online | Download pdf file

RL232N-COR01 photo
Loading ...
Loading ...
-2-
II. RECEIPT INSPECTION III. INSTALLATION (continued)
II. a - RECEIPT INSPECTION
All Traulsen products are factory tested for performance and
are free from defects when shipped. The utmost care has
been taken in crating this product to protect against damage
in transit. All interior fittings have been carefully secured and
the legs or casters are boxed and strapped inside to prevent
damage. Door keys will be attached to the handle with a
nylon strip. The handle is protected by an easily removable
nylon netting.
Carefully inspect your Traulsen unit for damage during
delivery. If damage is detected, you should save all crating
materials and make note on the carrier’s Bill of Lading
describing the damage. A freight claim should be filed
immediately. If damage is subsequently noted during or
immediately after installation, contact the respective carrier
and file a freight claim. Under no condition may a damaged
unit be returned to Traulsen without first obtaining written
permission (return authorization). You may contact Traulsen
customer care at 800-825-8220.
Some models may use R-290 (Propane)
as a refrigerant. If flammable refrigerant is present, follow
instructions as labeled on the unit. Proper care must be taken
to avoid any damage to the refrigeration system including
refrigerant tubing, condenser, evaporator coils during
handling, moving, installation and cleaning as it may cause
risk of fire or explosion. If damaged, unit must be moved to
well ventilated area away from any sources of ignition.
Further service and repair must be performed by qualified
refrigeration technicians familiar with applicable safety
standards for flammable refrigerants. Technicians must
use appropriate personal protective equipment and follow
applicable safety precautions to avoid risk of fire or explosion.
III. INSTALLATION
III. a - LOCATION
Select a proper location for your Traulsen unit, away from
extreme heat or cold. Allow enough clearance between the
unit and the side wall in order to make use of the door stay
open feature at 120° (self-closing feature operates up to 90°).
The door(s) must be able to open a minimum of 90° in order
to make use of the maximum clear door width available.
III. b - PACKAGING
All Traulsen units are shipped from the factory bolted to a
sturdy wooden pallet and packaged in a durable cardboard
container. The carton is attached to the wooden skid with
the use of large staples. These should first be
III. b - PACKAGING (cont’d)
removed to avoid scratching the unit when lifting off the crate.
Most exterior stainless steel surfaces have a protective
vinyl covering to prevent scratching during manufacturing,
shipping and installation. After the unit is installed in place of
service, remove and discard the covering from all surfaces.
To remove the wooden pallet, first if at all possible, we
suggest that the cabinet remain bolted to the pallet during
all transportation to the point of final installation. The bolts
can then be removed with a 3/4” socket wrench. Avoid laying
the unit on its front, side or back for removal of the pallet.
NOTE: DO NOT LAY THE UNIT ON ITS SIDE DURING
TRANSPORTATION OR INSTALLATION.
Roll-thru models also include special interior wood bracing,
intended to protect the cabinet during shipment. This bracing
should under no circumstances be removed prior to the unit
being installed in its final location.
Read and review these instructions, in their
entirety, BEFORE attempting to disassemble and remove
the interior bracing.
If either of the diagonal or upper ceiling braces are dropped,
they could cause personal injury or damage to the equipment.
To disassemble the bracing, first open the doors and carefully
remove the banding that holds the two diagonal braces
together.
The diagonal braces will now be loose and can
fall out of position and possibly permit the ceiling corner
brace to fall.
Carefully remove one diagonal brace while supporting the
ceiling corner brace, so that it does not fall (see figure 1).
Next, remove the ceiling brace, the remaining diagonal
brace, and lastly the floor brace - then discard. Repeat as
necessary for each section of the unit.
Fig. 1
Loading ...
Loading ...
Loading ...