Kolpak KF8-0808-CR Kold-Front Walk-In Cooler 8'-6.25" H, 7'-9" W, 7'-9" L with Era floor

Installation operation - Page 6

For KF8-0808-CR.

PDF File Manual, 38 pages, Read Online | Download pdf file

KF8-0808-CR photo
Loading ...
Loading ...
Loading ...
www.manitowocfsusa.com 800-225-9916 6
Site Preparation
CAUTION
Ensure that the area for installation is level and clear of all debris before beginning
assembly. If care is not taken to assure a level base, wall and ceiling panels will not
align properly, causing problems in installation and operation of door panels, and
potential performance issues due to escessive air leaks.
A 2” minimum clearance is required between the unit and any adjacent structures to
allow for wall surface irregularities and for air circulation. Air circulation around the
walk-in of 5 CFM per 100 Sq. Ft. of wall area is recommended. Failure to allow for this
clearance and air flow may result in performance issues such as excesive moisture
and/or condensation in the unit or adjoining areas.
Using the supplied assembly drawing (packed in hardware box), mark the
perimeter of screed, wall, or floor sections on the existing building floor using a
chalk line.
Perimeter lines must be square and parallel. Use the 3, 4, 5 rule of squaring as
illustrated.
After establishing the first two lines, measure and establish the rest of the
perimeter.
If the installation area is not level, find the high point of this perimeter line. The
floor, floor screed and wall must be leveled to this point.
Loading ...
Loading ...
Loading ...