Kolpak KF8-0808-CR Kold-Front Walk-In Cooler 8'-6.25" H, 7'-9" W, 7'-9" L with Era floor

Installation operation - Page 12

For KF8-0808-CR.

PDF File Manual, 38 pages, Read Online | Download pdf file

KF8-0808-CR photo
Loading ...
Loading ...
Loading ...
www.manitowocfsusa.com 800-225-9916 12
Flooring Overlay Installation
CAUTION
Installation of overlay material is best accomplished before the refrigeration system has
been started, and before any product has been loaded. In the event that overlay must
be added at a later date, ensure that the refrigeration system has been turned off and
that the subsurface has been allowed to return to a normal working temperature.
Installing at a low temperature may not allow the adhesive/sealant to cure adequately.
Clean and dry subsurface.
Apply silicone to the underside of flooring overlay material.
Begin laying first row of flooring overlay ½” away from the edge of the floor
according to the drawing and secure to the subsurface with sheet metals screws
or anchors.
All sheets must be as flush as possible to one another.
All sheets must be secured using a sheet metal screws or anchors every 24”.
Ensure that at least one fastener is used near each corner of the overlay
material.
Continue to follow the layout according to the drawing until all sheets are flush
and secured to the subsurface.
Caulk all seams and edges of flooring overlay material.
Allow 1-3 hours for the adhesive/sealant to dry prior to resuming use of the walk-
in.
Concrete & Tile Flooring
CAUTION
Gasses emitted by curing concrete floors or tile grout will damage panel finishes.
Adequate ventilation must be provided when the concrete floor or tile setting bed and
grout is curing. Leave all doors open for ventilation. If concrete or tile is to be installed
after walk-in is erected, protect the wall finish by applying a protective covering.
Loading ...
Loading ...
Loading ...