1.3 Remember to Measure Resistance
The resistance between the two conductor wires should be measured. Compare this
resistance reading to the “Total Ohms” column in Product section 4.1 for Heatwave®
Mats, and section 4.2 for Heatwave® Cables. The value should be within ±10%. Also
measure the resistance between each of the two conductors and the shielding/ground wire.
Both should read infinity or open. If there is a different than expected readings for any of these
measurements are observed, contact Heatizon Systems at 888-239-1232. Please refer to Section 7
(Commissioning) for instructions on how to measure the resistance.
1.4 Limited Lifetime Warranty
For the life of the floor covering and while in possession of the original owner, Heatizon warrants
that the Heatwave® heating cable is free from defects in material, design and workmanship. The
warranty is only valid if the warranty certificate has been properly completed, and the installation
is in accordance with the installation instructions.
2. Heatwave® System
2.1 Heatwave Specifications
MATS CABLES
Cable Construction
Twin Conductor Twin Conductor
Rated Voltage
120V, 240V 120V, 240V
Output
12W/ft2 (130W/m2) ± 10% 2.73 to 4.36W.ft (8.66 to 14.30W/m) ± 10%
Cable Spacing
3” (76.2mm) 2.5” to 4.5” (64.5mm to 114.3mm)
Cable Diameter
1/8” to 1/6” (3.2mm to 4.2mm) 1/8” to 1/6” (3.2mm to 4.2mm)
Conductor Insulation
Fluoropolymer Fluoropolymer
Outer Insulation
Fluoropolymer or TPE Fluoropolymer or TPE
Max. Ambient Temp.
85°F (30°C) 85°F (30°C)
Min Installation Temp
40°F (5°C) 40°F (5°C)
Cold Lead
2-wire heating conductor plus
ground braid; 15 ft (4.57 M)
2-wire heating conductor plus ground
braid; 15 ft (4.57 M)
Cable Construction
On/Off Control
Rated Voltage
120/240V ± 15%, 50/60 Hz
Output
15 AMP
Cable Spacing
40° to 104°F (5° to 40°C)
Cable Diameter
32° to 104°F (0° to 40°C)
Conductor Insulation
2-wire, 10 foot lead wire
2.2 Sample Thermostat Specifications
Important: measure the resistance four times during the installation process
Remember to always measure, verify and record the actual resistance throughout the
installation process (out of the box, after installation, after covering with cementitious
material, and after installation of floor covering).