Loading ...
Loading ...
Loading ...
AssembBy
Masle_
DO NOT REMOVE CHAIN AND CABLE FROM DIS-
PENSER CA RTON.
Detach cable from side of carton and fasten to tro!ley
with a master link from coin envelope
Cable
LOOl
MASTER LINK PROCEDURE: Push pins of master
link bar through loop of cable and hole in flat end of
trolley shaft Push cap onto pins and into notches,
Slide clip-on spring over cap and into pin notches
until both pins are locked in place
Notch
Master
Outside
B,3r
Flat End
Trofley
ShaN
Opener Chassis
Sprocket
CAUTION: Keep chain taut while dispensing from
carton to help prevent kinking,
Stide trolley tight against screwdriver stop. Dispense
cable around pulley bracket Proceed back around
the opener sprocket and forward to chain retainer
bracket Be sure teeth on chassis sprocket engage
chain
Connect chain to chain retainer bracket, as shown in
inset, using second master link from coin envelope.
NOTE: Check to make sure chain is not twisted.
Chain
Tee Rail
Chain
Retainer
Washered Screw Bracket
5/16"_18×1/2"'
5 t6"_18
Cable
Pulley
Bracket
Masler
Link
Master
Link
Threaded ;End
of Trolley Shaft
Trolley
As a permanent trolley stop, insert 5/16" washered
screw into remaining hole in Tee rail front, Tighten se-
curely with 5/16" nut. REMOVE TEMPORARYSTOP
INSERTED IN STEP 2_
Loading ...
Loading ...
Loading ...