GE - General Electric PNRQ20FBB00 GE reverse osmosis water system

User Manual - Page 8

For PNRQ20FBB00.

PDF File Manual, 84 pages, Download pdf file

Loading ...
Loading ...
Loading ...
Installation Instructions
REVERSE OSMOSIS ASSEMBLY
MOUNTING SYSTEM
INSTALLATION
Choose a location under the sink to mount
the system. Location should be easily
accessible, with adequate clearance between
the bottom of the filter cartridges and the
floor or bottom of the cabinet for removal
of filter cartridges. Allow enough space on
either side of the system for the tubing
con nections.
1. Remove the prefilter and postfilter
cartridges.
Toremove _, U_Toremove
Prefilter "_-'_"U U_l_ Postfilter
2. Remove the assembly cover by unlocking
the four tabs on the cover from the system.
3. Use a flat-head screwdriver to work from
left to right from the underside of the
system.
Screwdriver positioning
4. Use the icons on the bottom of the
system for screwdriver positioning.
,Tab
Screwdriver
.
Hold the Reverse Osmosis assembly up to
the wall surface where you wish to install
it. Mark location for screws. There should
be a minimum of 17 inches from the
marks to the bottom of the cabinet floor.
Screw locations
A,-, ,,, ,-,-,,-,R,
AuLI_,/-_U/IUI_I'- DO not get dirt or
debris inside the assembly area. Use only to
mark mounting hole locations.
6. Install screws to the wall, leaving a 3/16-
inch clearance between the head of the
screw and wall (drill pilot holes if needed).
8
7.
Hang the Reverse Osmosis assembly on
the screws. Tighten or loosen the screws
as desired until the system is secure on
the wall.
8. To install the
cover, line up
the front
tabs on the
cover with the
openings
in the system.
9. Snap the cover
in place; the
tabs will flex,
allowing the
cover to snap
in place.
10.
J
Remove the
membrane Membran_
cartridge.
To remove
Loading ...
Loading ...
Loading ...