Loading ...
Loading ...
Loading ...
Installation
130
Appliance dimensions: position of gas
and electrical connections
Position of gas and electrical connections
(measurements given in mm).
G = gas connection
H = electrical connection
Positioning and levelling the appliance
After making the electrical and/or gas
connections, properly level the appliance
on the floor to ensure better stability. Screw
or unscrew the bottom part of the leg until
the appliance is stable and level on the
floor.
Installing the front plinth
The front plinth must always be positioned
and secured correctly on the appliance.
1. Use a screwdriver to remove the front
screws under the storage compartment
door.
A56
B (max) 770
B (min) 744
C135
D55
E 1200
F (min) 894
F (max) 920
Loading ...
Loading ...
Loading ...