E95-2010 Sole elliptical machine

User Manual - Page 13

For E95-2010.

PDF File Manual, 35 pages, Download pdf file

Loading ...
Loading ...
Loading ...
STEP 4: Plastic Parts Assembly
1. Match up the outer Connecting Arm Covers (part # 109&110)with the pre-installed inner
connecting arm covers (P/N 111 & 112). Install the outer covers onto the Left and Right
Connecting Arms (8&9) and secure each side with one M5x15mm Phillips Head Screw
(139) and two 3.5x12mm Sheet Metal Screws (142) by using the Short Phillips Head
Screw Driver (185).
2. Install Sliding Wheel Covers (104) on each side and secure with four M5x15mm Phillips
Head Screws (139).
3. Install the two Stabilizer Covers (117 and 118) on the middle stabilizer bar with two
M5x15mm Phillips Head Screws (139).
4. Install the Front Stabilizer Cover (103) on the front stabilizer with two M5x15mm Phillips
Head Screws (139).
5. Install the two incline Cover brackets (25), with the hole for mounting the plastic cover on
the bent tab facing rearward, and secure them on the Incline Rail Assembly (2) with four
M6xl0mm Phillips Head Screws (145). Install the Rear incline bar cover (115) on the rail
base with two M5 x 15m/m Screws (139).
6. Install the Rear Stabilizer Cover (116) on the Rear Stabilizer with four M5x15mm Phillips
Head Screws (139).
7. This step to be performed after the elliptical power is plugged in. Run the incline to
position 8 and install the incline Rail front cover (113) up against the middle stabilizer
tube with four M5x15mm Phillips Head Screws (139).
12 E55 / E95 Elliptical
Loading ...
Loading ...
Loading ...