Napoleon HDX52NT2 STARfire Series Direct Vent Natural Gas Fireplace

User Manual - Page 19

For HDX52NT2.

PDF File Manual, 132 pages, Read Online | Download pdf file

HDX52NT2 photo
Loading ...
Loading ...
Loading ...
19
W415-2180 / A / 11.28.16
EN
A
. Fasten the roof support to the roof using the screws provided.
The roof support is optional. In this case the venting is to be
adequately supported using either an alternate method suitable
to the authority having jurisdiction or the optional roof support.
B. Stretch the inner fl ex pipe to the required length. Slip the
inner fl ex pipe a minimum of 2” (51mm) over the inner pipe
of the air terminal connector and secure with 6 #8 screws.
Seal using a heavy bead of Mill Pac sealant (W573-0007)
(not supplied).
C. Repeat using the outer fl ex pipe, using a heavy bead of
Red RTV Silicone (W573-0002) (not supplied).
D. Thread the air terminal connector / vent pipe assembly
down through the roof. The air terminal must be positioned
vertically and plumb. Attach the air terminal connector to the roof
support, ensuring that the top of the air terminal is 16” (406mm)
above the highest point that it penetrates the roof.
E. Remove nails from the shingles, above and to the sides of the
air terminal connector. Place the fl ashing over the air terminal
connector leaving a min. 3/4” (19mm) of the air terminal connector
showing above the top of the fl ashing. Slide the fl ashing
underneath the sides and upper edge of the shingles. Ensure that
the air terminal connector is properly centred within the fl ashing,
giving a 3/4” (19mm) margin all around. Fasten to the roof. Do not
nail through the lower portion of the fl ashing. Make weather-tight
by sealing with caulking. Where possible, cover the sides and top
edges of the fl ashing with roofi ng material.
F. Aligning the seams of the terminal and air terminal
connector, place the terminal over the air terminal connector
making sure the vent pipe goes into the hole in the terminal.
Secure with the three screws provided.
G. Apply a heavy bead of weatherproof caulking 2” (51mm)
above the fl ashing. Install the storm collar around the air
terminal and slide down to the caulking. Tighten to ensure
that a weather-tight seal between the air terminal and the
collar is achieved.
H. If more vent pipe needs to be used to reach the fi replace see
“HORIZONTAL AIR TERMINAL INSTALLATION” section.
24.2B
STORM COLLAR
FLASHING
CAULKING
WEATHER
SEALANT
2” (51mm)
AIR INLET
BASE
ROOF SUPPORT
INNER FLEX PIPE
INNER PIPE
MILL PAC
SEALANT
(W572-0007)
AIR
TERMINAL
CONNECTOR
OUTER FLEX PIPE
MAINTAIN A MINIMUM 2” (51mm) SPACE BETWEEN THE AIR INLET BASE AND THE STORM COLLAR.
!
WARNING
4.2.2 VERTICAL AIR TERMINAL INSTALLATION
Loading ...
Loading ...
Loading ...