Craftsman 13953916D garage door opener

User Manual - Page 12

For 13953916D.

PDF File Manual, 76 pages, Download pdf file

Loading ...
Loading ...
Loading ...
INSTALLATION STEP 1
Determinethe HeaderBracketLocation
To prevent possible SERIOUSINJURYor DEATH:
Header bracket MUST be RIGIDLYfastened to structural
support on header wall or ceiling, otherwise garage door
might not reversewhen required. DO NOT install header
bracket over drywall.
Concrete anchors MUST be used if mounting header bracket
or 2x4 into masonry.
NEVERtry to loosen, move or adjust garage door, springs,
cables, pulleys, brackets, or their hardware,ALL of which
are under EXTREMEtension.
ALWAYScall a trained door systems technician if garage
door binds, sticks, or is out of balance. An unbalanced
garagedoor might not reverse when required.
Installation procedures vary according to garage door types.
Follow the instructions which apply to your door.
1. Closethe door and mark the inside vertical centerline of the
garagedoor.
2. Extendthe line onto the header wall above the door.
Youcan fasten the header bracketwithin 4 feet (1.22 m) of
the left or rightof the doorcenter only if a torsion springor
center bearingplate is in the way; or youcan attach it to the
ceiling (see page 13) when clearance is minimal. (It may be
mountedon the wall upsidedown if necessary,to gain
approximately1/2" (1 cm).)
If you needto install the headerbracket on a 2x4 (on wall or
ceiling), use lag screws (not provided) to securely fasten the
2x4 to structural supports as shown hereand on page13.
3. Openyour door to the highest point of travel as shown. Draw
an intersecting horizontal line on the headerwall above the
high point:
2" (5 cm) above the high point for sectional door and
one-piece door with track.
8" (20 cm) above the high point for one-piece door without
track.
This height will provide travel clearance for the top edge of the
door.
NOTE: If the total number of inches exceedsthe height
available in your garage, use the maximum height possible, or
refer to page 13 for ceiling installation.
Header Wall
Header Wall
'_-_--2" (5 cm) Track
Highest Point
of Travel
--Door
Sectional door with curved track
Door
Hardware
Header Wall
:8" (20 cm)
Highest
Point
One-piece door without track:
jamb hardware
Unfinished
Ceiling _ OPTIONALBRACKETHEADERFORMOUNTCEILING
Vertical Centerline
of Garage Door
2x4
Structural
Supports
H
Y
Header Wall Track
I
Highest Point
_oHf Travel
T
One-piece door with horizontal track
Header Wall
: 8" (20cm)
Pivot
One-piece door without track:
pivot hardware
12
Loading ...
Loading ...
Loading ...